Category: | Month: | Day: | Year: |
The existing built up roof system and assoc. components will be removed to existing roof decks consisting of metal deck, poured gypsum deck, and replaced with a new 2 ply modified bitumen roofing system and assoc. roofing components on the existing low slope roof areas, totaling approximately 68,500 square feet. A/E contact: Jon Wiggins/Terracon/jon.wiggins@terracon.com
The existing built up roof system and assoc.components will be removed to existing roof decks consisting of metal deck, poured gypsum deck, and replaced with a 2 ply modified bitumen roofing system and assoc. roofing components on teh existing lowe slope roof areas, totaling approximately 44,300 square feet. A/E contact: Jon Wiggins/Terracon/jon.wiggins@terracon.com
The existing built up roof system and assoc. components will be removed to existing roof decks consisting of metal deck, poured gypsum deck, and structural wood fiber deck, and replaced with a new 2-ply bitumen roofing system and associated roofing components on the existing low slope roof areas, totaling approx. 39,500 square feet. A/E contact: Jon Wiggins/Terracon/jon.wiggins@terracon.com
The renovation of the interior space of an existing 17,800 sq. ft, single story, masonary building into a functional Collegiate Sports Fieldhouse to include men's and women's locker rooms, restrooms, offices, laundry room, training room, weightroom, and the wrestling practice area. The renovation scope consists of constructing walls to sub-divided areas, lighting, HVAC duct work, Fire Alarm, Sprinkler System modifications, flooring and finishes.
Construction of the new Colleton County Tax Payer Service Center located at 118 Benson Street, Walterboro, SC 29488. Approximately 6027sf facility to include a drive thru teller, adjacent parking area, parking lot lighting, milling and resurfacing of approximately 3675sy of asphalt along Benson Street and Klein Street. The milling and construction of parking spaces in front of the Jesse Padgett Building, bordering Klein Street consisting of approximately 784sy.
Bids for the Galleria Blvd. Extension Project# 17228-003A
The City of Manning will accept separate sealed bids for the complete demolition and disposal of Twelve (12) residential structures containing asbestos located within the City of Manning. You are invited to submit a Bid in accordance with the specifications in the Request for Bids package.
Recover Roofing Project
Work includes but is not limited to replacing Fan Coil Units and Water Source Heat Pumps with heating and chilled water equipment.
Asphalt Overlays on various roads in Savannah Lakes Village. Bid Security, Performance Bond and Payment Bond required. Plan Deposit is $100, Free if sent by email. Hand Deliver/Mail Bids to McCormick County, 610 South Mine St., McCormick, SC 29835. Bids will be opened at the Administration Center, 610 South Mine St., McCormick, SC 29835.
Demolition drawings showing the disconnection and removal of existing tank-type electric water heater currently located in kitchen mechanical closets in each living suite in Villas 1, 7-9( Four Buildings Total). Small and Minority Business participation is strongly encouraged.
Pickens County, South Carolina is accepting bids from licensed and qualified Contractors for the Laurel & Hardy Lake Rd Project. This project consists of roadway improvements, an existing asphalt road (approximately 0.10 miles) located within Pickens County. Project includes clearing, grading, drainage, and paving (Hot Mix Asphalt Surface Course Type C (220 #/SY).
Grand Strand Water & Sewer Authority (GSWSA) will be receiving sealed bids for the construction and installation of the INTERNATIONAL DRIVE BOOSTER PUMP STATION (629-01 / CGRE190054) and appurtenant items as prepared by Goodwyn, Mills, and Cawood, Inc. (GMC) in Horry County, SC.
Electrical, mechanical, structural, and minor architectural revisions to existing Cath Labs 10 and 13 to accommodate the replacement of imaging equipment.
Bid Opening - 02/09/2021 at 3:00pm - 28 Ehrhardt Street, Charleston, SC
The project includes the potential resurfacing of 28 roads as seen in the pricing schedule in the IFB. The majority of roads will be patching, milling, and 1.5" of Type "C" surface. Work will be coordinated through the 2021 calendar year based on weather and available funds.
A description of each project is in the IFB. Projects include pond rehabilitation, sleuth repairs, pipe replacement, and other work.
Project includes interior demolition, interior renovation and upfit of existing building, not limited to system replacements, new walls and finishes, and new waterline to the existing building. New program will include office spaces, nursing simulation labs, and support spaces per the Construction Documents. Small and Minonrity business participation is highly encouraged.
Installation of a liquified petroleum gas fueled packaged backup pump system with associated piping, site work and appurtenances
The project consists of new construction site work, retaining walls, a 2-story scorers tower with concession and restroom areas, a pre-engineered open-air picnic shelter, playground areas, restroom building to accommodate Little League fields, and a maintenance building as part of the project scope. |
Repair/replace selective concrete deck and metal deck roof sections at Building 300 Main Hospital. Work also includes repairs also to an existing planter and an exisitng expansion joint.
Total removal of existing roof systems down to the concrete deck panels for Roof Area E for approximately 185 squares. Roof replacement includes minor deck repairs, rough carpentry, roof insulation, including taper, and a three-ply modified bitumen roof system. All associated sheet metal components and accessories are included. New fall protection accessories and markings to be provided as part of the Base Bid.
The City of Spartanburg is requesting proposals to renovate a portion of the Spartanburg Opportunity Center located at 701 Saxon Ave.
The City of Clinton is accepting sealed bids for the installation of 580' of 8" Gravity Sewer Line to serve a newly constructed speculative building. Instructions and advertisement for bids may be found on the City of Clinton's website www.cityofclintonsc.com. Bids will be accepted until 2:00 PM February 11, 2021.
All required materials, equipment and labor necessary to complete the construction of Roadway, Water, and Wastewater Improvements for the Hardeeville Commerce Park.. Generally, the project includes the construction of approximately 1,425 LF of 12-inch ductile iron waterline, 2,425 LF of 8-inch PVC waterline, 3,735 LF of 8-inch PVC gravity wastewater line, a pump station, 455 LF of 6-inch PVC forcemain and 6,100 LF of roadway improvements and associated drainage infrastructure.
Demoltion of existing asphalt parking lot and associated concrete walks, site elements, uderground utilities, etc. Re-grading of site and installation of new concrete walks and hardscaping.
Bids for the Law Enforcement Training Center (LETC) Window Replacement Project
One elevated 2.0 MG Composite Water Tank to include all associated appurtnenances, site work, grading, foundations, tank erection, piping, fencing, stormdrainage, electrical, SCADA and instrumentation and a tank mixer.
Operator/Employee Facility at the Edmund Landfill
CCHRCO Purchasing Consortium is now accepting bids for the following;
Vinyl siding; Roofing; Floor covering; Gutters and Downspouts; Kitchen Cabinets; Counter tops; Bath Renovations; Replacement Windows (vinyl); Entry doors (steel); Security Screen Products alum.and steel
Cement Modified Recycled Base, HMA Paving, and Miscellaneous Related Items on Lynwood Drive, Lancaster, SC.
Repair asphalt and add concrete to two damaged areas of a fueling site
The Riverbanks Zoo and Garden is seeking a general contractor to build a six-foot by eight-foot single story shade structure on the Northern Ape Island.
The Clover School District is accepting bids to remove an existing roof and replace it at Griggs Road Elementary School. Prebid meeting will be January 28, 2021 at 3:00 pm at Griggs Road Elementary School.
Replace existing roof & gutters on a commercial facility located at 2748 Wagener Road, Aiken, SC. Pre-bid conference 2:00 PM, Jan. 19 2021.
The work to be performed consists of furnishing all materials, tools and equipment and performing all labor necessary for cleaning and coating the exterior and interior of the existing 300,000 gallon Williams Street elevated water storage tank as outlined in the specifications and contract documents.
Replacement of existing built-up roofing system with two-ply modified bitumen roof system at low-slope areas; replacement of roof drains, flashings and metal flashings.
Anderson School District Two is seeking a qualified vendor to perform a replacement of existing mechanical systems.
Renovations to existing DSS Building.
Construction of the Stockbridge Regional Wastewater Pump Station & Force Main
Patch, Repair, and Paint Exteior of Building, Metal Roof, and Patio.
THE COUNTY OF GREENVILLE IS ACCEPTING SEALED PROPOSALS FROM VENDORS TO REPLACE EXISTING PLAYGROUND EQUIPMENT, LOCATED AT SHOELESS JOE JACKSON MEMORIAL PARK
Single Prime Contract includes but not limited to the construction and installation of approximately 251 LF of new 6 foot wide catwalk, relocation of electrical and all piping, extenstion of appropriately 230 LF of new 1 inch non-potable water line and associated work necessary to render the facilities complete and operational. All work shall be as described or implied in the Specifications and indicated on Contract Drawings. Mandatory pre-bid meeting 1/21/2021 at 1:00 pm Eastern.
The project includes the construction of pathways along Goethe and Shults Roads in Bluffton, SC. It will disturb approximately 3.9 acres in the Goethe Rd ROW (from Hwy 46 to Hilderbrand Rd) and Shults Rd ROW (from Eight Ave to Hilderbrand Rd). In addition, the project includes the replacement of driveways and improvements to the roadside swales and drainage infrastructure.
Renovation of existing Men's and Women's toilets on the Close Side 3rd Floor. The only official site visit will be offered following the pre-bid meeting. Small and minority business participation is strongly encouraged.
Renovation of approximately 10,000 sf of interior space for offices, training, reception, break room and conference room. The only official site visit will be offered following the pre-bid meeting. Small and minority business paricipation is highly encouraged.
RIA funding for replacement of the water distribution system infrastructure on North Market St. and adjacent connecting streets. The project area consist of existing waterline pipes which are approaching a 100 year service life. Most of the existing lines in the area are of galvanized steel composition. Lines are in need of replacement to ensure safe and reliable drinking water.
Oconee County is seeking sealed bids for construction services for new turn lanes and an eastern entrance to the Heritage Farm Center on Sandifer Boulevard (US Highway 123).
The installation of a new roof recover system including flute fill insulation, coverboard and new 60 mil thermoplastic membrane over the extising metal panel roof system, installation of new skylights, new gutters and downspouts and all associated roofing work as specified.
The City of West Columbia would like to install and implement an Advanced Metering Infrastructure (AMI) system. The scope will include the selection and implementation of a Fixed Based System that will work effectively with West Columbia’s personnel and existing infrastructure. The intent of this Proposal is to allow each vendor to provide West Columbia with an optimal solution for an AMI system.
The County of Newberry is soliciting sealed bids for the addition to the facility maintenance shop located at 11494 SC Hwy 34, Newberry. The existing facility is where the cotnracted vendor services the County's fleet for emergency services and other county vehicles. Pond Architects is the architect for this project. A non-mandatory pre-bid meeting will be held on January 19th at 11:00 a.m. in the Newberry Co. Courthouse Annex, 1309 College Street, Newberry.
The scope of work includes: The installation of approximately 17,876 LF of 8”, and 1,035 LF of 10” Cured in Place Pipe (CIPP) into existing sanitary sewer gravity mains throughout Georgetown County, SC. Installation shall include end seals and reinstatement of sewer service laterals
PLEASE SEE THE FULL AD IN THE LINK. Improvements consist of demolition and removal of existing components including controls, pumps, piping, etc. and upgrading the pump stations in accordance with the Construction Documents. The wetwell will remain at County Line Pump Station. The Deerwood Estates wetwell will be removed and a new wetwell will be installed as part of the upgrades. Diesel Generators and automatic transfer switches will be provided at both stations.
Scope of work includes removal of the existing low slope roof system and thermosetting fill insulation system down to the existing concrete roof deck and replacement with a new lightweight insulating concrete system and a fully adhered TPO roof system for approx. 65 squares. All new sheet metal items associated with the installation of the new roof assembly are required.
Replace existing panelboard interiors and covers at twelve (12) Pee Dee Center Buildings. For site visit contact: Curtis Amerson (843) 664-2733. Pre-Bid-1/13/21 at 10:00 AM, SCDDSN, 3440 Harden St. Ext.,Ste. 247, Columbia,SC 29203. Refundable Plan Deposit $25.00. Obtain plans: Seth Leslie, P.E., Email: seth.leslie@ddsn.sc.gov. Phone: (803) 898-9712.
SCOPE OF WORK: HVAC REPLACEMENT WITH VARIOUS INTERIOR FINISH AND SYSTEM UPGRADES TO EXISTING BUILDING. ALSO INCLUDED ARE VARIOUS SITE IMPROVEMENTS AND SEVERAL WALKWAY CANOPIES. CM-R PROJECT WITH CONTRACT CONSTRUCTION. CONTACT: GLENN DILLON AT 803-781-7058.
SCOPE OF WORK: HVAC EQUIPMENT REPLACEMENT WITH VARIOUS INTERIOR FINISH AND SYSTEM UPGRADES TO THE EXISTING BUILDING. ALSO INCLUDED ARE VARIOUS SITE IMPROVEMENTS AND A NEW CANOPY. CM-R PROJECT WITH CONTRACT CONSTRUCTION. CONTACT: GLENN DILLON AT 803-781-7058.
SCOPE OF WORK: CAFETERIA EXPANSION AND COOLER/FREEZER ENCLOSURE, HVAC EQUIPMENT REPLACEMENT WITH VARIOUS INTERIOR FINISH AND SYSTEM UPGRADES TO EXISTING BUILDING. ALSO INCLUDED ARE VARIOUS SITE IMPROVEMENTS. CM-R PROJECT WITH CONTRACT CONSTRUCTION. CONTACT: GLENN DILLON AT 803-781-7058.
SCOPE OF WORK: HVAC EQUIPMENT REPLACEMENT WITH VARIOUS INTERIOR FINISH AND SYSTEM UPGRADES TO EXISTING BUILDING. ALSO INCLUDED ARE VARIOUS SITE IMPROVEMENTS. CM-R PROJECT WITH CONTRACT CONSTRUCTION. CONTACT: GLEN DILLON AT 803-781-7058.
Scope of work includes selective roof repairs at Wren Elementary, Spearman Elementary and Palmetto Elementary.
Pre-Bid: February 2, 2021 at 10:00 am - Anderson School District One, 801 North Hamilton Street, Williamston, SC 29697
Cleaning, sealant repairs and painting on the old and newer sections of the 1930 and 1990 additions to the Fike Recreation Center exterior building envelope.
Expansion of existing bookstore to include general construction, demolition, MEP, and associated fire sprinkler and alarm modifications. Qualified minority owned companies are encouraged to submit a bid.
THIS PROJECT INVOLVES THE CONSTRUCTION OF REPAIR MEASURES TO ADDRESS SOIL EROSION ISSUES BENEATH A BUILDING. THE WORK REQUIRES INSTALLATION OF TEMPORARY HELICAL PILES TO UNDERPIN THE EXISTING WALL FOUNDATION; CONCRETE REPAIR TO DRAINAGE CONDUIT SIDEWALL; BACKFILLING EROSION VOID WITH FLOWABLE FILL; GROUT INJECTION THROUGH FLOOR SLAB; PLACEMENT AND COMPACTION OF EARTH FILL TO FINISHED GRADE; AND SITE RESTORATION WITH SOD.
Commercial Site Development at Myrtle Park
Kellett Elem.School Abatement and Demolition
Sealed bids for Kellett School Bldg Abatement and Demolition received at 221 E. N. 1st Street, Seneca, SC 29679; Monday, February 8, 2021 at 3pm. Scope: asbestos abatement, demo and disposal. Bid info request electronically Seneca website.
Phase I - Removal of existing AHU #1 and installation of new AHU. Scope includes all required electrical wiring, controls and test and balance of the system for a full turnkey operation.
Replacement of HVAC VAV terminal units & DDC controls
Demolition and removal of existing bridge structure. See full description on county's website
and request from Jessica Brady at brady.j@tandh.com or 803-451-6785
RESURFACING SPARTANBURG COUNTY
The work includes the complete modernization of three (3) existing elevators, in the Wade Hampton Building. This also includes but not limited to: material, labor and installation of equipment for machine rooms, hoistways, pits, cab finishes, remotely located monitoring system, mechanical, plumbing and electrical systems.
Furnishing all materials and equipment and performing all labor necessary to construct the I-26 Industrial Park Monument Signage as detailed in construction plans, landscaping work as detailed on the construction plans, and all incidental work required for a complete and functional installation.
Construction of the New Heritage Gravity Sewers - Phase 2 (Project# 17260)
CTC paving and convenience site paving at multiple locations in Dorchester County, as described in the solicitation documents.
Reconstruction and widening, drainage, curb & gutter, sidewalksand misecllaneous items along 0.087 miles of South Depot Street from East South 3th Street to East South 4th Street and 0.100 Miles along East South 4th Street from South Depot Street to South Walnut Street in the City of Seneca.
It is the intent of Beaufort County to solicit competitive sealed proposals from qualified proposers with the ability and capacity to design, construct, manage, and provide all construction administration for Beaufort County Dirt Road Paving Program.
Scope of work includes roof replacement of the low slope roof systems on Roof Area A down to the existing roof deck for approximately 215 squares (21,438 sq ft). Roof replacement includes roof deck replacement/repairs and installation of new roof insulation, including taper insulation, and new installation of a fully adhered thermoplastic PVC / KEE roof assembly. All new sheet metal items associated with the installation of the new roof assembly are required.
The project is a one-story, slab on grade, pole structure with prefinished wood roof trusses, prefabricated metal roof panels and two ornamental cuploas. It is will include radiant heater units, min-split HVAC units and multiple sectional/manually operated garage doors, landscpaping and signage.
Sealed bids for the replacement of approximately 95 water services serving customers along South Waccamaw Drive, Tarpon Circle, Stingray Ct, and Sailfish Drive in Garden City, South Carolina. Pricing shall include unit pricing for all labor, equipment, and materials for proper installation of all required items and following GCWSD and SCDHEC requirements and regulations.
The County of Orangeburg is soliciting quotes for providing Hot Mix Asphalt for C-Fund Road Construction. The bid document & other info can be found at https://sc-orangeburgcounty.civicplus.com/244/Procurement - FY21-0918A Hot Mix Asphalt C-Fund Road Construction Projects (West of 95). Late bids won't be accepted. Orangeburg County reserves the right to accept/reject any or all bids.
The County of Orangeburg is soliciting quotes for providing Hot Mix Asphalt for C-Fund Road Construction. The bid document & other info can be found at https://sc-orangeburgcounty.civicplus.com/244/Procurement - FY21-0918 Hot Mix Asphalt C-Fund Road Construction Projects (East of 95). Late bids won't be accepted. Orangeburg County reserves the right to accept/reject any or all bids.
Anderson County is seeking bids for DOLLY COOPER PARK BASEBALL FIELD PHASE I PROJECT, Bid# 21-010. Interested parties may request information at allpurchasing@andersoncountysc.org.
Intersection improvement at Grier Street and Calhoun Street to include removing and replacing approximately 56 linear feet of asphalt roadway,installing new curb and gutter,and installing new ADA compliant sidewalk. The bid opening will be held via a zoom conference call access information will be sent to all plan holders.
Orangeburg County is soliciting quotes for Rocks for C-Fund Road Projects. The RFQ FY21-0731 can be found at www.orangeburgcounty.org. Quotes are due by 7/31/2020 2:00pm. No late quotes accepted. Contact J. Ferris, Procurement Director jferris@orangebugrcounty.org. Orangeburg County has the right to accept/reject any or all quotes
The City of Florence is accepting sealed bids from qualified and licensed vendor to build a single family residence at 250 North Pointe Drive, Florence, SC.
SCOP: Replacement of existing HVAC System serving a portion of the 1st floor and all of the second floor in the Central Servies Building. Chilled water VAV air handlers, VAV boxes with hot water reheat, supply and return ductwork. Related work includes minor wall repairs, minor removal and replacement of ceiling/lights and electrical work related to the HVAC system replacements