Category: | Month: | Day: | Year: |
Installation of approximately 620 feet of sidewalk to include all associated grading, excavation, demolition, compaction and erosion control measures per plans and Specifications by Blackwood Associatees, Inc. dated 6/22/2018.
Asbestos abatement of approximately 3,200 SF office space; abatement consists of safely removing and properly disposing of gypsum board and VCT flooring with asbestos laden mastic; includes the selective demolition of non-asbestos carpeting, metal studs, hollow metal door frames, wood doors, ceiling grid and acoustical tile to facilitate future renovation.
Traffic Control Services along Assembly and Blossom Streets for the Strom Pedestrian Bridges skylight replacement project. Small and Minority Business Particpation is strongly encouraged.
Poured concrete pad at our tennis center
Provide material and labor to construct sidewalk, curb, and other modifications to overflow parking lot per specifications and drawings
GCRA will receive sealed bids for repair work at 314 E. Bearden Street, Greer, SC 29651. For questions and for access to the property, please contact John Merritt at (864) 242-9801, extension 107, or at jmerritt@gcra-sc.org.
Traffic Control Services along Assembly and Blossom Streets for the Strom Pedestrian Bridges skylight replacement project. Small and Minority Business Particpation is strongly encouraged.
Remove and replace concrete curbing, sidewalk and asphalt pavement. Small and Minority Business Participation is strongly encouraged.
Close: July 25, 2018 10AM 1300 Pickens Street; Conf Rm 100C; Columbia, SC 29208