South Carolina Business Opportunities
Published by Division of Procurement Services - Delbert H. Singleton, Jr., Division Director
Ad Category: Construction
Ad Start Date: December 17, 2019
Agency/Owner: Department of Corrections
Project Name: Water & Wastewater Statewide Maintenance – Tyger River Aerator Replacement
Project Number: N04-9752-MJ-A
Construction Cost Range: $90K to $125K
Project Location: 200 Prison Road, Enoree, SC 29335-9308
Description of Project/Services:

Project is for the removal and replacement of one of the Tyger River Correctional Institution's Waste Water Treatment Plant's Aerator located at the Tyger River Correctional Institution in Enoree.  All of the existing aerator equipment will be removed and retained in designated area by owner.  A non-mandatory site visit will be available on 01/07/2020 following the pre-bid meeting.  More -- see attachment.

Bid/Submittal Due Date & Time: January 23, 2020 - 2:00pm
Number of Bid/Submittal Copies: 1
Project Delivery Method: Design-Bid-Build
Agency Project Coordinator: Aaron Turner - Division of Facilities Management
Email: turner.aaron@doc.sc.gov
Telephone: 803-896-1787
Documents May Be Obtained From: Bid Plans and Specs are availabe in PDF form ONLY and must be obtained by emailing a request to Joey Privette at American Engineering Consultants, Inc. at: jprivette@aec-sc.com.
Project Details: https://scbo.sc.gov/files/scbo/N04-9752-MJ-A%20SE-310%20signed.PDF
South Carolina Business Opportunities • SCBO Team • 1201 Main Street, Suite 600 • Columbia, SC 29201
803-737-0600 • scbo@mmo.sc.gov • https://scbo.sc.gov • https://procurement.sc.gov