South Carolina Business Opportunities
Published by Division of Procurement Services - Delbert H. Singleton, Jr., Division Director
Ad Category: Construction
Ad Start Date: January 31, 2020
Agency/Owner: Lander University
Project Name: Horne Arena and the PEES Building Roof Replacements
Project Number: H21-9540-PD
Construction Cost Range: $2.25M TO $3.0M
Project Location: Lander University Campus / 450 Willson St, Greenwood, SC 29649
Description of Project/Services:

Scope of work includes selective roof replacement at of the low slope roof areas down to the existing roof deck for approximately 97,791sq.ft.Roof replacement includes roof deck replacement/repairs and installation of new roof insulation,including taper insulation, and new two ply modified bitumen roof assembly.Scope to include the removal and replacement of brick veneer on a 30ftx22 ft.section of the Arena wall and installing Post-Installed brick ties on the left and right panels.

Bid/Submittal Due Date & Time: March 3, 2020 - 2:00pm
Number of Bid/Submittal Copies: 1
Project Delivery Method: Design-Bid-Build
Agency Project Coordinator: Jeff Beaver, Director - Office of Engineering Services
Email: jbeavber@lander.edu
Telephone: (864) 388-8208
Documents May Be Obtained From: WM Building Envelope Consultants, daniel@wmbeconsultants.com
Project Details: https://scbo.sc.gov/files/scbo/H21-9540-PD_0.pdf
South Carolina Business Opportunities • SCBO Team • 1201 Main Street, Suite 600 • Columbia, SC 29201
803-737-0600 • scbo@mmo.sc.gov • https://scbo.sc.gov • https://procurement.sc.gov
SFAA Logo