South Carolina Business Opportunities
Published by Division of Procurement Services - Delbert H. Singleton, Jr., Division Director
Ad Category: Construction
Ad Start Date: March 11, 2020
Agency/Owner: Medical University of South Carolina
Project Name: Psych Institute Chiller #1 Replacement
Project Number: H51-9834-ML
Construction Cost Range: $1M to $2M
Project Location: Medical University of South Carolina, Charleston SC
Description of Project/Services:

Replacement of a centrifugal water cooled chiller, cooling tower, chilled water pumps and condenser water pumps in the existing mechanical room located on the 6th level in the Institute of Psychiatry. Project includes Alternate One to replace the standard centrifugal chiller with a magnetic bearing centrifugal chiller of same capacity. PRE-BID MEETING WILL BE THE ONLY OPPORTUNITY FOR A SITE VISIT.

Bid/Submittal Due Date & Time: April 15, 2020 - 10:00am
Number of Bid/Submittal Copies: 1
Project Delivery Method: Design-Bid-Build
Agency Project Coordinator: Robert C. Branson
Email: bransonr@musc.edu
Telephone: 843-792-7502
Documents May Be Obtained From: http://www.muscplans.com/
Project Details: https://scbo.sc.gov/files/scbo/H51-9834-ML%20SE-310.pdf
South Carolina Business Opportunities • SCBO Team • 1201 Main Street, Suite 600 • Columbia, SC 29201
803-737-0600 • scbo@mmo.sc.gov • https://scbo.sc.gov • https://procurement.sc.gov
SFAA Logo