Ad Category: Construction
Ad Start Date: June 23, 2021
Agency/Owner: Department of Mental Health
Project Name: Morris - Bryan Energy Center Drainage Improvements - Revised
Project Number: J12-9898
Construction Cost Range: $100,000 - $120,000
Project Location: 220 Faison Drive Columbia, SC 29203
Description of Project/Services:

Base bid for the replacement of approximately 264 LF of 15-inch RCP, 49 LF of 18-inch RCP, 24-inch RCP, and miscellaneuous appurtenances; installation of 154 LF of 12-inch HDPE pipe, 150 LF of 4-inch CPP or PVC underdrain, 3 junction boxes, 2 catch basins, associated rip rap and grading.  Alternate 1 consisting of sliplining 33 LF of existing 12-inch RCP with 10-inch fusible PVC. Alternate 2 consisting of removal and  replacement of 33LF of existing 12-inch RCP with HDPE pipe.

Bid/Submittal Due Date & Time: July 29, 2021 - 2:00pm
Number of Bid/Submittal Copies: 1
Project Delivery Method: Design-Bid-Build
Agency Project Coordinator: David R Carver
Email: david.carver@scdmh.org
Telephone: 8432456690
Documents May Be Obtained From: http://buildingprojects.scdmh.org/2021/06/04/morris-bryan-energy-center-drainage-improvements/
Project Details: http://buildingprojects.scdmh.org/2021/06/04/morris-bryan-energy-center-drainage-improvements/