South Carolina Business Opportunities
Published by Division of Procurement Services - Delbert H. Singleton, Jr., Division Director
Ad Category: Construction
Ad Start Date: April 23, 2024
Agency/Owner: Greenwood Commissioners of Public Works
Project Name: Edgefield/Kirksey Water Main Replacement
Project Number: W-2-2024
Construction Cost Range: n/a
Project Location: Greenwood, SC
Description of Project/Services:

Installation of ~6,700 linear feet (lf) of 8-inch ductile iron pipe (DIP) water main, ~3,500 linear feet (lf) of 6-inch ductile iron pipe (DIP) water main. Includes all associated water services, fire hydrants, gate valves, other appurtenances, connections to and terminations from existing active water mains, asphalt cutting and paving, concrete cutting and replacement and other items as outlined in the Contract Documents. 

Bid/Submittal Due Date & Time: June 13, 2024 - 9:45am
Number of Bid/Submittal Copies: 1
Project Delivery Method: Design-Bid-Build
Agency Project Coordinator: Jonathan Atkins
Email: jatkins@greenwoodcpw.com
Telephone: 864-942-8180
Documents May Be Obtained From: Greenwood CPW (bids@greenwoodcpw.com)
Project Details: https://greenwoodcpw.com/about-us/active-bids/
South Carolina Business Opportunities • SCBO Team • 1201 Main Street, Suite 600 • Columbia, SC 29201
803-737-0600 • scbo@mmo.sc.gov • https://scbo.sc.gov • https://procurement.sc.gov
SFAA Logo