South Carolina Business Opportunities
Published by Division of Procurement Services - Delbert H. Singleton, Jr., Division Director
Ad Category: Construction
Ad Start Date: January 22, 2025
Agency/Owner: Department of Natural Resources
Project Name: PREQUALIFICATION for Greenville-Poinsett Bridge Restoration
Project Number: P24-6007-PG
Construction Cost Range: $500,000 to $600,000
Project Location: Poinsett Bridge Heritage Preserve
Description of Project/Services:

REVISED PRESUBMITTAL CONFERENCE: Poinsett Bridge built in 1820 and listed in the National Register of Historic Places. Restoration involves repointing all mortar joints with historic mortar to match. Roadbed to be removed & replaced with waterproof membrane & engineered fill. Contractor/Subcontractor shall have proven experience with similar field quarried stone structures and rehabilitation projects. Field quarried stone experience is preferred.

Bid/Submittal Due Date & Time: February 6, 2025 - 2:00pm
Number of Bid/Submittal Copies: Printed: 5 Electronic: 1
Project Delivery Method: Design-Bid-Build
Agency Project Coordinator: Jeff Boyer
Email: boyerj@dnr.sc.gov
Telephone: (803) 360-0042
Documents May Be Obtained From: Jeff Boyer
Project Details: https://scbo.sc.gov/files/scbo/SE-110_0.pdf
South Carolina Business Opportunities • SCBO Team • 1201 Main Street, Suite 600 • Columbia, SC 29201
803-737-0600 • scbo@mmo.sc.gov • https://scbo.sc.gov • https://procurement.sc.gov
SFAA Logo