South Carolina Business Opportunities
Published by Division of Procurement Services - Delbert H. Singleton, Jr., Division Director
Ad Category: Construction
Ad Start Date: August 5, 2026
Agency/Owner: Winthrop University
Project Name: p Lake Dam Renovation
Project Number: H47-9612-PD
Construction Cost Range: $755,000 to $825,000
Project Location: Winthrop Lake Dam
Description of Project/Services:
The Work consists of alteration of an existing dam including: reservoir drawdown and dewatering; site clearing and grubbing; removal of existing outlet works; construction of a new cast-in-place reinforced concrete combination service/emergency spillway structure (horseshoe configuration); installation of new 48-inch ductile iron pipe outlet works; hand-placed riprap outlet protection. As shown on Contract Drawings. Drawings and specified herein
Bid/Submittal Due Date & Time: September 3, 2026 - 2:00pm
Number of Bid/Submittal Copies: 1
Project Delivery Method: Design-Bid-Build
Prime Contractor License (Special Standard of Responsibility): Marine (MR) license.
Agency Project Coordinator: James Grigg
Email: griggj@winthrop.edu
Telephone: (839) 835-7208
Documents May Be Obtained From: Will Armstrong - will@armstrongglen.com - 704-529-0345
Project Details: https://scbo.sc.gov/files/scbo/H47-9612-PD_SE-310.pdf
South Carolina Business Opportunities • SCBO Team • 1333 Main Street, Suite 700 • Columbia, SC 29201
803-737-0600 • scbo@mmo.sc.gov • https://scbo.sc.gov • https://procurement.sc.gov
SFAA Logo