South Carolina Business Opportunities
Published by Division of Procurement Services - Delbert H. Singleton, Jr., Division Director
Notice Of Intent To Sole Source By: SC 250 Commission
Ad Category: Sole Source and Emergency
Notice Start Date: November 10, 2026
Notice End Date: November 25, 2026
Vendor Name: Kenneth B. Simmons and Associates, LLC ( KBS)
Contract Amount: 75,000
Agency Procurement Manager: Aimee Hood
Agency Procurement Manager Email: AHood@scdah.sc.gov
Agency Procurement Manager Telephone#: 8038983392
The Agency hereby provides notice that it intends to enter into a sole source contract per S.C. Code Ann. §11-35-1560 with Vendor for the following supplies, services, information technology, or construction:

SC250 intends to award KBS a contract for preliminary siting concepts for the Fallen Martyrs, Francis Marion, and Michael Kováts monuments at Marion Square, a privately owned square used by the public.

The City of Charleston hired KBS twice for park inventory and monument study work. KBS has also worked independently with the owners of Marion Square, the City, and SC250, and has participated in discussions about the two siting alternatives. Its team is in place to carry forward the owners’ site priorities, the City’s public-use considerations, and SC250’s interpretive goals and coordinate reviews around the three parties’ 250th commemoration milestones.

Basis for Award Without Competition
The preferred concept is required by [date] for [specific review or commemoration milestone]. Even with a structured handoff, a successor would need to repeat [specific site review or partner coordination steps], adding [documented time] and preventing delivery by the required date. KBS can build on that work and deliver the preferred concept by [confirmed date].

Scope of Work

  1. Review existing conditions. Review available site records and coordinate with a professional surveyor to obtain the boundary, as-built, tree, and topographic information and private utility locating needed to compare the layouts. Determine whether a survey limited to the proposed monument areas is sufficient before commissioning a full-square survey.
  2. Prepare two preliminary siting concepts. Show the Fallen Martyrs Monument along Calhoun Street with the Francis Marion and Michael Kováts monuments near the former Citadel building in one concept, and all three monuments along Calhoun Street in the other. Evaluate monument orientation and relationships, existing landscape features, pedestrian circulation, and continued public use.
  3. Coordinate review and refine the preferred concept. Participate in up to five in-person meetings. Incorporate the Board of Field Officers’ site information, SC250’s historical guidance, and stakeholder comments. Deliver two preliminary concept drawings and one revised preferred concept in PDF.
Agency's justification for a sole source procurement may be viewed or immediately obtained at: Agency Procurement Manager (Listed Above)
PROTESTS:
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. § 11-35-310(13).

Any Notice Of Intent To Protest And Protest Must Be Addressed To: Materials Management Officer
South Carolina Business Opportunities • SCBO Team • 1333 Main Street, Suite 700 • Columbia, SC 29201
803-737-0600 • scbo@mmo.sc.gov • https://scbo.sc.gov • https://procurement.sc.gov
SFAA Logo