South Carolina Business Opportunities
SC Business Opportunities
| Category: | Month: | Day: | Year: |
Bentley ProjectWise licenses and resident consultantshttps://apps.sceis.sc.gov/SCSolicitationWeb/contractSearch.do
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Brand Connex LLC is the licensing company for the US News and World Report Badges that are awarded annually and are the number one source of 3rd Party validation for The Citadel. No other vendor can provide the required services.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Official partnership of the RBC Heritage presented by Boeing to use the RBC Heritage logo in SCPRT promotional materials and advertising.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
IBM will provide annual maintenance and support for the University's existing IBM SPSS Statistics and IBM SPSS Amos Perpetual Enterprise Unlimited License. Services include software maintenance, product updates, patches, vendor technical support, and continued support of the University's existing enterprise deployment.
The software is currently deployed throughout the University and distributed through the Division of Information
Technology's software distribution services. No implementation or installation services are required because the software environment is already fully operational. The maintenance renewal ensures continued access to vendor-supported updates and support for the existing perpetual enterprise license.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Columbia Metropolitan Airport will provide advertising space within the airport facility, including all associated production, installation, and display services necessary for the placement and maintenance of the university's advertising materials throughout the contract term.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Johnson Controls will provide the replacement of the obsolete Simplex fire alarm control panel located in the Wellness and Fitness Center, including all required proprietary hardware, software, programming, configuration, testing, commissioning, and integration services necessary to ensure full functionality of the fire alarm system. Services will include installation, system programming, operational verification, and support required to maintain compliance with life safety, building code, and fire code requirements.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Johnson Controls will provide ongoing professional services consisting of weekly training sessions, troubleshooting support, technical consultation, and operational guidance related to the university's building management and HVAC control systems. Services will include instruction on system operation, maintenance procedures, diagnostics, troubleshooting techniques, programming, optimization, and best practices for the effective use of Johnson Controls proprietary equipment and software.
Training and technical support will be delivered by certified Johnson Controls personnel with specialized expertise in the systems deployed throughout the university's facilities. These services will ensure university staff maintain the knowledge and skills necessary to effectively operate, maintain, and optimize system performance.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
DTO is procuring preventative maintenance, repair activies, and 24/7/365 onsite support for Vertiv uninterruptible power supply (UPS) modules and accompanying computer room cooling units. This equipment provides emergency power and cooling at the State Data Center. Vertiv is the original manufacturer of the equipment, and requires it be maintained by certified technicians to prevent the voiding of warranties and support agreements.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Clemson University is member of the Online Computer Library Center (OCLC) consortium of libraries who produce WorldCat, the Online Union Catalog. OCLC provides services such as locating, acquiring, cataloging, lending and preserving library materials as well as obtaining bibliographic, abstract and full-text information through their computer library services. The structure of OCLC has changed in that they no longer use regional providers such as Lyrasis (as we have used in the past). Now all services are provided direct from OCLC, therefore this is a sole source.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
The boiler loop supplying the academic wing suffered an underground rupture that required immediate repair. This loop provides steam to the HVAC system’s reheat coils, helping regulate humidity levels and reduce the risk of mold growth.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this emergency contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this emergency contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Raptor Tech has proprietary software modules that enable emergency activations/notifications to all staff at buildings, allowing accountability of students/staff during emergencies and drills, and has reunification software to reunite students with parents during an incident. This software is held exclusively through Raptor Tech. This also includes behavior and threat assessments, dismissal system, hall pass management, event and visitor software modules that increase school safety and building integrity. Combability with existing equipment, repair parts, supplies, and procedures is of paramount consideration.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Electronic Clearing House to submit claims for OMH inpatient Facilities and Community Mental Health Centers. Electronic Data Interchange (EDI) System provides for the transmission of electronic claims in the ANSI formats for both institutional (UB) and professional (HCFA 1500) claims as dictated by the standards for electronic transactions, 45 C.F.R parts 160 and 162, issued pursuant to the Health Insurance Portability and Accountability Act (HIPPA) of 1996. These claims are sent to CompuGroup via File Transfer Protocol (FTP) from our Inpatient Billing System (Avatar). The client is installed and configured o the computers in the Reimbursement department, and SCDMH has worked with Compugroup to set up the crosswalks between Avatar and their system for electronic claim submission. The client is proprietary software which CompuGroup either owns or has the right to license, relicense or sublicense, including all updates or error corrections which CompuGroup provides to their customers. CompuGroup will run all claims transactions thru Transactions rule edits and payer specific edits as part of the claims submission process. Once claims have processed though edits, claims are sent to insurance carriers locally or nationwide. CompuGroup also gives the user the ability to access eligibility and claim status inquiries. User can run standard and custom reports. This system is crucial to our everyday submission of claims for the SC OMH. CompuGroup provides access to proprietary software-based services which assist OMH in conducting electroni health care transactions with payers.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
The SC Dept. of Public Health, Public Health Lab (PHL) requires continued warranty, maintenance, and software support services for multiple SCIEX analytical instruments, including the QTRAP 6500+ Mass Spectrometer, X500R QTOF System, and Exion AC LC Pump. These instruments are mission‑critical to PHL operations and are essential for high‑sensitivity mass spectrometry workflows, newborn screening analysis, complex quantitation, and high‑resolution data acquisition. To maintain required performance, uptime, data quality, and regulatory compliance, these systems must be supported under OEM‑certified service plans (Assurance PM, LC Assurance, and Software Plus). Without these services, instrument reliability, calibration accuracy, and software compatibility cannot be guaranteed, directly impacting testing operations and public health program outcomes.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Rock Communications, LLC is the sole authorized dealer in South Carolina for FleetTalk products and services, which are used exclusively by the District’s Transportation and Safety Departments. The District has an existing, districtwide communication system built upon the FleetTalk radio network infrastructure. The seamless integration and full functionality of any additional or replacement radios require strict compatibility with the current system, which is proprietary to Rock Communications.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Lexington School District Two hereby provides notice that it intends to enter into a sole source contract per Lexington School District Two Code §11-35-1560 with CodeHS, Inc. for access to the Code HS full catalog of online curriculum for a period of one year. CodeHS provides content that is aligned to the SC State Standards and provides teachers of other computer credit courses to access standards aligned curriculum for the Fundamental of Computing courses.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Richland School District Two intends to procure all labor and materials for the purchase of new Seon cameras and the repair of existing Seon camera systems installed on state and district buses. Mobile Communications America is the sole authorized dealer and service provider for Seon products in the state of South Carolina.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
In accordance with the Sole Source section 11-35-1560 in the South Carolina Consolidated Procurement, the College of Charleston is announcing its intent to procure a Siemens direct digital control (DDC) system for Rita Hollings building from Control Management for a one-time purchase via solicitation # 27-14-SDM-SS. To view the justification, click on the link provided below.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
In accordance with the Sole Source section 11-35-1560 listed in the South Carolina Consolidated Procurement, the College of Charleston is announcing the intent to procure Billboard – Outdoor advertisement in York County from Adams Outdoor Advertising for a one-month period via solicitation # 27-16-SDM-SS. To view the justification, click on the link provided below.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
HGTC plans to make a sole source purchase with Anatomage for virtual cadaver tables with 6 real-human, 1,5000+ real patient cases, histology slides, prosections, 309 animal CT/MRI, segmented dog, cat, frog, mouse, and monkey. It will be used in our science lab programs.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
It is the intent of ATC to purchase 1 Adult EVO base package and accessories. This SIM provides high-fidelity multi-system assessments that are instrumental in Nursing programs. This SIM was selected over its competitors for its physiological integration, which is critical for complex medical-surgical scenarios.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
It is the intent of ATC to purchase 1 SimBaby, 1 MamaAnne, and 1 SimNewB. These simulators are unmatched and considered the gold standard for Nursing programs. They offer more accurate feedback. Other options fail to provide the same realism and learning experience.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
It is the intent of ATC to purchase 2 SUSIE® S2400 Patient simulator packages and 1 Advanced Pediatric HAL® S2225 with accessories, as these are the gold standard for Nursing programs. They provide unmatched tactile and complicated scenarios.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
A software solution providing Course Evaluation, Surveys, and Faculty Accomplishment tracking. Lander solicited for a solution to provide Course Evaluations, Surveys, and Faculty Accomplishments via RFP-SP-05-16-2023 and awarded Watermark Insights. The term of this agreement ends July 31, 2026.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Automatic License Plate Recognition (ALPR) solution for the equipment, installation, supplies, hardware, software, communication, updates/upgrades, repair, warranties, replacement, support, service and subscription renewals and any other needs related to the SCDC’s (ALPR) equipment
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
The UFED 4PC Ultimate System to include all license, training, analytics, upgrades and related equipment & supplies.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
SAS system software license renewal, support, consulting, and managed services.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Behavioral technology SAAS platform and services for the criminal justice system and community partners. Annual licensing, design, development, software maintenance & support.
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Emergency contract for individual supervision by group care staff for high acuity youth at Coastal Autism Academy group home
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this emergency contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this emergency contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).
Axiom Add-on Consulting Professional Services
Any actual or prospective bidder, offeror, contractor, or subcontractor aggrieved in connection with the intended award or award of this sole source contract, shall notify the appropriate chief Procurement officer in writing of its intent to protest within five (5) business days of the date this notice is posted. Any actual or prospective bidder, offeror, contractor, or subcontractor who is aggrieved in connection with the intended award or award of this sole source contract and has timely notified the appropriate chief procurement officer of its intent to protest, may protest to the appropriate chief procurement officer in the manner set forth below within fifteen days of the date this notice is posted; except that a matter that could have been raised as a protest of the solicitation may not be raised as a protest of the award or intended award of a contract.
A protest must be in writing, filed with the appropriate chief procurement officer, and set forth the grounds of the protest and the relief requested with enough particularity to give notice of the issues to be decided. The protest must be received by the appropriate chief procurement officer within the time provided above. Days are calculated as provided in S.C. Code Ann. §11-35-310(13).

Print Ad