Mechanically sand, prep, prime and paint all exterior handrails at the front entrance of the building, to include the handrails at the steps and the ramps, and the lintels at the back entrance. Site visit strongly encouraged, contact Andrew Tharin 803-898-9423, atharin@ddsn.sc.gov to arrange.