The work to be completed as a part of this project consists of providing all required materials, equipment and labor necessary to construct the 2016 Sewer Rehabilitation-Division A, including replacement of approximately 1,452 linear feet (LF) of 12” gravity sewer line with 16” Ductile Iron gravity sewer line; replacement of seven (7) existing manholes; modifications to two (2) existing manholes; removal and replacement of asphalt pavement: and related items.