The project will consist of in-situ rehabilitation of approx 900 linear ft of 18-inch gravity sewer, 2,865 linear ft of 24-inch gravity sewer and 2,135 linear ft of 30-inch gravity sewer, located along the Saluda River. The work will include Cured-In-Place Pipe repair of the existing 5,900 linear ft of gravity sewer and manhole rehabilitation. A pre-bid conference will be held at 10:30AM on Dec 3, 2019 at West Columbia City Hall. Attendance at the pre-bid is mandatory.