Category: | Month: | Day: | Year: |
Richland County is soliciting electronic bids from licensed contractors for the Public Works Department's Hobart Road re-alignment project. All questions and submittals must be submitted via the Bonfire portal.
This project consists of providing all required materials, equipment and labor necessary to complete the construction of Groundwater Test Well. Generally, the project includes the construction of the Test Groundwater Well for Clarendon County Water and Sewer Department with 8-inch Well Diameter, Assumed Yield up to 750 GPM located at TMS# 144-00-03-037-00 in Manning, South Carolina. Specific details are included within the Construction Plans and Technical Specifications.
Georgetown County, SC is soliciting sealed bids for several roof replacements and repairs at various County Facilities. See bid document for a listing work needed per location and all bid requirements. A voluntary pre-bid meeting and site visits will be performed on Thursday, July 18, 2024 @ 9:00 AM ET at the Howard Auditorium Event Room located at 1610 Hawkins St., Georgetown, SC 29440.
Greenwood County is seeking proposals to replace the HVAC system at the Greenwood County Courthouse, 528 Monument Street, Greenwood, SC 29646.
M.B. Kahn seeks proposals for 3 projects-1)Complete structural, mech. & interior reno of Pratt Mem. Library, 2)Interior renovations 112 Weathersby St. & 3)Finishes & furn. upgrades at Courthouse
The project is to construct two concrete pads in the appropriate location indicated by a map of
the parcel at 1726 Gardendale road. The work will include grading, compaction and base coarse within the construction area. The concrete pad is to be
constructed according to the concrete pavement detail. One pad
will be 75 feet by 75 feet and the other will be 25 feet by 25 feet.
Resurfacing / Coating, Layouts, Nets / Fencing
Specs available at www.mullinssc.us
Providing and installing new six-inch water main in Chimney Swift Subdivision which includes approximately 1,630 lf of 6” water main, 2,820 lf of 4” water main and connecting 41 residences to the
new potable water system. Bids are requested for the following Contract: Chimney Swift Subdivision Water Main Extension, RIA Grant No. S-24-1349.
CM At-Risk Services for the construction of a new +/- 43,2120 SF Center for Welding & Automation Excellence on the Brashier Campus in Simpsonville, SC. The anticipated building program will include welding labs, a simulation lab, a fabrication lab, classrooms, offices and a multi-purpose/flex space. Qualified minority owned businesses are encouraged to submit qualifications.
The City of Tega Cay intends to procure a Design-Builder to deliver design and construction
services for, exploratory drilling, design and installation of high-density polyurethane grouting within the
right-of-way of the Cebu Court cul-de-sac in Tega Cay, South Carolina. The purpose of the grouting
program is to fill and stabilize voids discovered within the old uncontrolled fill soils within the right-of-way
of the roadway.
Approx. 2000 lf of 24" RCP Stormwater pipe, 10 catch basins, 2 junction boxes, and all accompanying appurtenances. 5% bid and P&P bonds required. Funded by SCIIP & SLFRF thru ARPA, admin by RIA. All contractors & subs to be SAM registered & not debarred from Fed Government. Must comply with Fed regulations. $100 for electronic plans & specs.
Constructing approximately 4,570 LF of 10” gravity sewer main and 30 manholes along with the necessary service reconnections.The Town of Heath Springs Sewer Outfall Replacement Project is funded in whole or in part by a state grant and SCIIP grant from the SC Infrastructure Authority, and therefore, bidders must comply with all applicable State and Federal requirements. All contractors and subcontractors are required to be registered in the federal SAM.
Construction of 2" and 6" water lines (approximately 15,000 LF) in the Town of Branchville, SC
The Project consists of the following: Furnish and install new storm-drain, new storm-drain boxes,
remove and replace existing asphalt, furnish and install new rolled curb, remove and replace existing
concrete drives.
Georgetown County is seeking competitive bids for the relocation of the existing entrance to the boat ramp and of the access road to the remote parking lot beside Belin United Methodist Church located on US Highway 17 Business in Murrells Inlet, SC. See bid document and drawings for full project details.
Repair and rehabilitation of storm drain piping varying in size from 24" to 64" in diameter and several storm drain structures
Horry County Government and Sourcewell are jointly soliciting sealed proposals for RFP #:2023-24-100: Indefinite-Delivery, Indefinite-Quantity (IDIQ) Construction in the State of South Carolina (Horry County, SC and Sourcewell). A full copy of the RFP can be found on the Sourcewell Procurement Portal (https://proportal.sourcewell-mn.gov).
Interior renovations to the first and second floors of the SCCB Building A. Renovations to include all new finishes, new plumbing fixtures, the reconfiguration of office spaces, and addition of break room. A complete renovation of the HVAC and lighting systems are included.
Beaufort County requests proposals from all interested firms, licensed in the State of South Carolina, experienced in providing qualified Design-Build Teams to provide architectural and engineering design and construction services for construction of two community centers at Agnes Major Park & Wesley Felix Park in Beaufort County, SC.
Beaufort County requests proposals from all interested firms, licensed in the State of South Carolina, experienced in providing qualified Design-Build Teams to provide A&E design and construction services for construction of a community center at Francis Jones Park on Daufuskie Island in Beaufort County, SC.
This project is located in the Town of Lane, Williamsburg County, South Carolina, and consists of various repairs and improvements to the existing Lane Water System to include the following work: Water Main Replacement, Renovate Lane-Williamsburg County Master Meter Connection, SCADA, Existing Elevated Water Storage Tank Improvements, Existing Well Improvements. The issuing office is Eastern Engineering located at 108 South Acline St, Lake City, SC 29560.
The project includes replacement of equipment associated with the North Pretreatment train (one (1) bar screen and two (2) grit collectors) and two (2) primary clarifiers. The project includes mechanical and electrical improvements as specified in the contract documents.
Qualified Contractors may bid on this contract. The Board of Public Works reserves the right to reject any and all bids.
TN Development is requesting sealed bids from general contractors for construction of nine 1300 to 1500 SF affordable homes. Four which are located on Pendleton St. in the MLK historical district and Five are located on McFadden & Ogden St. in the Jones McDonald Community Club neighborhood. Contractors must be properly licensed in South Carolina and have a current City of Columbia business license. The JMCC development does not have historical requirements.
The Project consists of the rehabilitation by pipe burst method of approximately 6,800 linear feet of 8” gravity sewer, 440 linear feet of 6” gravity sewer, and rehabilitating approximately 23 existing manholes.
This Project includes cleaning and TV'ing 32,000' of existing 8" to 10" sanitary sewer; lining 32,000' of existing 8" to 10" sanitary sewers with cured-in-place pipe lining (CIPP), removing protruding services, performing point repairs, and re-connecting active laterals; rehabbing 150 laterals via CIPP or replacement; rehabbing 40 manholes using cementitious mortar and performing other manhole rehab work such as replacing frames and covers and rebuilding existing benches and inverts.
Dorchester County is seeking bids from qualified and experienced contractors interested in completing the Poplar Grove Pump Station and Force Main Project, consisting of approximately 12,400 LF of 8” sanitary sewer force main from the Hamlet Center at Bulow Landing Road to Bear Swamp Road.
Division A consists of constructing the RO well, monitoring well, piping, electrical work, electrical building, site work, related transmission mains and associated appurtenances. Division B consists of constructing the ASR well, monitoring well, piping, electrical work, electrical & chemical feed building, site work, related transmission mains, and associated appurtenances.
The Project is located in Williamsburg County, South Carolina, and consists of improvements to the existing water system
Replace Boiler #2 and Associated piping at the FM Energy Facility.
Installation of 3,345 LF of 8" water main, 1,285 LF of 6" water main, (5) fire hydrants, (2) blow-off assembly and related appurtenances to serve approximately 55 new residences and provide flow for fire protection.
Installation of 4,700 LF 8" gravity sewer line with (30) thirty manholes, aerial crossing and 55 service connections and all necessary related appurtenances.
Seeking a licensed contractor to complete construction of security fencing at the Barnwell County Detention Center. A pre-bid conference is required, please reach out to Capt. Cohen 803-586-5613 to arrange conference and receive specific construction guidance. Please email mwright@barnwellcountysc.gov for full RFP documents.
Installation of 20,910 LF 20-inch Force Main and 4,610 LF of 24-inch FM and all related work and appurtenances. LCWSD Force Main is funded in part by Federal funds from US-DC-EDA and therefore is subject to Federal laws and regulations. Also funded in part by SC RIA and therefore all bidders must comply with all State and Federal Requirements including Davis-Bacon. All contractors must be registered in federal System Award Management (SAM).
Installation of a new 2,900-GPM Pump Station, +/- 6,800-LF of new 20-Inch Force Main, +/- 650-LF of new 18-Inch Gravity Wastewater Line with Manholes and all related work. The Town of Fort Lawn Pump Station and Force Main Project is funded in part by the SCRIA via SCIIP, and therefore, bidders must comply with all applicable State and Federal requirements, including Davis-Bacon. All contractors and subcontractors are required to be registered in the federal SAM.
The work shall include the complete Up-fit of the 10th Floor located in the 1401 Main Street Building as indicated on the contract documents titled " 1401 Main Street 10th Floor Renovations".
A mandatory Pre-bid meeting will be held on July 11th, 2024, at 10:00 AM on site at the Regional Recreation Complex located at 418 East Main Street in Moncks Corner. We will meet at the existing playground.
The work to be done consists of furnishing all materials, equipment and labor necessary to construct a new All Inclusive Playground with associated sidewalks site improvements and parking lot.
Upfit construction of 49,671 square foot, three story cold dark shell space at the East Tower of the USC Science and Technology Building to accommodate Classrooms, Laboratories, Offices and Student Spaces. Bids shall be submitted in accordance with hand delivery or mail service only. Small and Minority business participation is highly encouraged.
The project consists of the installation of approximately 20,000LF of Ductile Iron Pipe, 138 valves, and 18 fire hydrants on Union Street. Includes service re-connections and asphalt removal/replacement. This project is being funded in whole or in part by the South Carolina Infrastructure Investment Program (SCIIP), which is administered by the RIA and funded by SLFRF through the American Rescue Plan Act (ARPA). SCIIP Grant Award A-23-C182, Federal Award ID: SLFRP5410.
Renovations to the equipment wash area to facilitate the installation of a new Cage Wash and Tunnel Wash. Replace ACT ceilings, remove and recoat concrete floor with epoxy coating, light mechanical and electrical work, replacement of sprinkler heads and minor concrete work. Bids shall be submitted in accordance with hand-delivery or mail service only. Small and Minority business participation is highly encouraged.
The renovation area is located on the 9th floor within an existing rehabilitation unit. The project will create support and therapy areas including an open gym, occupational / daily living, and speech therapy spaces. The project shall also update 2 existing patient toilets to provide a roll-in shower. The area of construction encompasses approximately 5358 sq ft.
Removal of 3 existing dry pit submersible pumps, 3 existing variable frequency drives, and existing valves/piping and replacing with 3 new dry-pit submersible pumps, 3 new VFDs, new valves/piping, and all electrical/instrumentation/appurtenances. Must also provide temporary bypass pumping during construction, refurbish existing pump control panel, 1 spare dry-pit submersible pump identical to the 3 installed pumps, 1 spare VFD identical to the 3 installed VFDs.
The scope of this project includes the widening of Blythewood Road from two lanes to five lanes from Syrup Mill Road to Muller Road and improvements to the turning lanes and traffic signals at Syrup Mill Road and Muller Road. It will also include constructing sidewalks along Blythewood Road and a stubout for a future four-lane Terra Road.
Installation of fixed generators with concrete support pad and required electrical at six existing sanitary sewer pump stations, and other miscellaneous and related items.
Qualified bidders are invited to submit bids for the redevelopment of Caston Park which includes but is not limited to the construction of parking, pickleball courts, tennis courts, and other items included in the plan set. A pre-bid meeting is set for July 11th at 2PM at 220 High Street. Prospective bidders are requested to attend.
The purpose of this project is for water intrusion repairs. The area of work is limited to repairing active leaks at the building envelope, minor roofing repairs, select roof drains and minor gutter repairs. Bids shall be submitted in accordance with hand-delivery or mail service only. Small and Minority business participation is highly encouraged.
The City of Spartanburg is seeking proposals from vendors to provide services for West Main Street Trail Project: Services include drainage installation, existing sidewalk demolition and installation of new protected bike lanes and multi-use trail system. Pre-bid meeting on site Tuesday 7- 23-2024, at 11:00 AM at the intersection south corner of Walker St. & W. Main Street.
Southern Loop 2A Improvements consist of approximately 5,500 LF of 12" PVC Force Main, 1,050 LF of HDD, 400 LF of 12" DIP in 24" steel encasement, 480 LF of 12" DIP in 30" steel encasement, Judy PS modification, 3 connections to existing system and appurtenances. Please see www.kershaw.sc.gov for the full ad.
Construction & installation of a Modular or Site built Bathroom. The structure shall be approximately 40' Length x 15' Width x 8' Height (roof line excluded), and consist of 2 fully accessible bathrooms and one janitorial space / supply closet with its own egress. Please visit www.mullinssc.us for the specs.
Bids need to be addressed to Felicia Sawyer-Norton
1.1.1 KW Green Student Center Expansion will be a 40,000 square foot “state of the art” facility expansion to an existing 30,000 square foot building in the core of the South Carolina State University Campus. It will serve as the primary gathering spot and food service area for the campus.
Rehabilitation/replacement of approximately 5,470 LF of rehabilitated gravity sewer lines and 37 manholes. The project is partially funded by Federal grant funds and the Contractor must comply with all applicable local and federal requirements in the bid documents, including Davis-Bacon and Section 3. Contractors are required to be registered in the federal System for Award Management (SAM.gov) prior to the contract award.
Receive sealed bids(285 Park NE, Wagener SC 29164)construction of influent bar screen structure, soda ash feed system, replacement of WWTP’s existing effluent flow meter,construction of a new irrigation well, yard piping, site work, electrical, and all necessary appurtenances specified & depicted in Contract Documents.Includes removal of excess sludge in the wastewater treatment lagoon by dredging, dewatering, and disposal of sludge in an approved landfill.
Renovation with limited reconfiguration of approximately 11,00sf of existing patient unit. Updated finishes, fixtures, fittings and doors in most bathrooms, two additional nurse stations, finishes in additional limited areas and related MEP.
RE-BID. Replace existing power & water infrastructure, with utilities to be installed through horizontal directional drilling/boring. Documents Obtained From: https://www.scprt.com/about/procurement-opportunities/construction-bids/projects-out-for-bid
Spartanburg School District 2 is seeking responsive and responsible vendors to prequalify for Roofing Construction Services
It is the goal of this RFP to select a qualified Design/Build Contractor to work closely with the County to complete the design and construction of Azalea Phase 4 (Charleston County EMS).
York County is seeking qualified vendors to serve as Construction Manager At‐Risk, for design review and preconstruction services, potential construction and commission of water line improvements in the River Hills Neighborhood .
Georgetown County is seeking sealed bids for the removal of a section of the existing Apron and replacement with a reconstructed Apron. A pre-bid conference and site inspection will be held on Tuesday, July 2nd at 3 PM ET at the Georgetown Airport. See project manual and drawings for full project details, pre-bid conference and site inspection information and all bid requirements.
New chiller plant intended to serve campus cooling needs. The full building supports 9,000 tons of chilled water generation equipment. This phase completes the side development, building and provides the first 1,500 tons of chilled water generation capacity. In addition, new 24" chilled water mains are being added to connect the plant to the existing chilled water distribution system.
The Gilbert-Summit Rural Water District is soliciting bids for their PRV Station installation project. The scope of work consists of the construction and installation of five (5) PRV's throughout their system, as defined in the construction plans. Quest Project number: 9196734
It is the intent of Beaufort County to solicit competitive sealed proposal from qualified and experienced demolition contractors to remove the structure and its foundations at the Agnes Major Community Center site at 21 Agnes Major Rd., Seabrook, SC 29940, in Sheldon, South Carolina.
The objective of this Request for Qualifications (RFQ) is to solicit interest and credentials from qualified firms, or individuals, licensed in the State of South Carolina to provide construction materials testing and special inspection services for the Catawba Bend Preserve Phase 1 project.
Base Bid includes selective roof replacement of Roof Areas A, C, D, and F for approximately 41 Squares. Roof replacement includes removal of existing roof system down to the roof deck, installation of a modified bitumen ply roof system. Associated sheet metal components and accessories are included.
Replace an existing aged effluent line from the Forest Trails WWTP to the receiving water body. It consists of approximately 960 linear feet of new 16-inch gravity sewer line with manholes. The project also includes the installation of two outfall boxes, miscellaneous pavement repairs, and site restoration.
Structural (concrete) and cosmetic (ligthing, signage, etc.) upgrades for Parking Garage P1 located at: 1170 Farrow Parkway, Myrtle Beach, SC 29577 and Parking Garage P2 located at: 3076 Deville Street, Myrtle Beach, SC 29577.
General Contractors will be issued the Bidding Documents via a File Transfer link. Contact Donna Patterson at dpatterson@pmharchitects.com. The request for documents must be in writing and must include an email address, name and phone number.
Installation of ~5,000 linear feet (lf) of 8-inch and 6-inch ductile iron pipe (DIP) water main. Includes all associated water services, fire hydrants, gate valves, other appurtenances, connections to and terminations from existing active water mains, asphalt cutting and paving, concrete cutting and replacement and other items as outlined in the Contract Documents.
Separate sealed bids for Waterline Extension along Hollyberry Lane for the City of Florence will be received by the City of Florence in the City Center, Purchasing/Contracting Office, 324 West Evans Street, Florence, SC 29501 until 3:00 P.M. on August 6th, 2024.
Separate sealed bids for the Waterline Extension along Darlington Street for the City of Florence will be received by the City of Florence in the City Center, Purchasing/Contracting Office, 324 West Evans Street, Florence, SC 29501 until 2:30 P.M. on Tuesday, July 30th, 2024.
Interior Upfit of I.P. Stanback's lobby, gift shop, ERC, and Gallery II.
Separate sealed bids for Waterline Extension along Whitehall Shores Road for the City of Florence will be received by the City of Florence in the City Center, Purchasing/Contracting Office, 324 West Evans Street, Florence, SC 29501 until 2:45 P.M. on August 6th, 2024
Separate sealed bids for the Waterline Extension along Meadors Road for the City of Florence will be received by the City of Florence in the City Center, Purchasing/Contracting Office, 324 West Evans Street, Florence, SC 29501 until 2:30 P.M. on Tuesday, August 6th, 2024.
Replacement of exterior egress stair and repair of the north elevation wall at Dorm C. Replacement of the exterior front stairs, porch decking, railings, and new building signage at the Marine Lab. Bidders shall submit bid in accordance with Hand-Delivery or Mail Service only. Small and Minority Business participation highly encouraged.
Clearing the site of trees, brush, fences, buildings, and obstructions occupying space needed for construction; Demolition of existing pumps, piping, valves, electrical equipment, and pump house; Installation of two new submersible pumps and associated valves and piping, including underground valve vault; Lining of existing wetwell; New site fencing, asphalt, and entry gate improvements; New emergency generator and electrical equipment; Upgrades to existing Hightide SCADA.
The Project is located in the Town of Pamplico, Florence County, South Carolina, and consists of expansions to the existing water system to include the following Work:
Replacement of approximately 276 LF of 10" gravity sewer, 6,948 LF of 8" gravity sewer, (35) manholes and all necessary appurtenances to replace existing mains in the service area.
This project is being funded by a grant from the SC Rural Infrastructure Authority (RIA), and all Bidders must comply with all applicable state and federal requirements identified in the Contract documents. SAM.GOV registration will be used to verify debarment status as required.
Non-Mandatory Pre-Proposal Meeting 7/3/24 @ 1 pm (ET) via zoom
Non-Mandatory Site visit 7/3/24 @ 3 pm (ET) held in person at the Metro Wastewater Treatment Plant (1200 Simon Tree Ln, Columbia, SC 29201)
24245 LF of 8” PVC FM, 6415 LF of 8” HDPE or FPVC directional bore, 60 LF of 8” in 20” encasement bore, 14 ARV, 2 MH w/coating, 6” meter and vault. Alt Bids: 5480 LF of 6” in lieu of 8” PVC, 960 LF of 12” GS and 2 MHs in lieu of 8” FM, Rehabilitation of 11 MH. Project is funded by SRF and USDA RD
The City is accepting sealed bids from qualified and licensed contractors to compete the waterline extensions on Southborough Road.
Generally, the expansion includes the construction of four (4) baseball fields, dugouts, fencing, sidewalks, parking lot additions and reconstruction, septic system, storm drainage upgrades, striping and signage, a two-story concession/restroom/scorekeepers facility, electrical system upgrade and lighting. For plans contact Wendy Culley wculley@AllianceCE.com, Fee is $300 per set.
The Lower Savannah Council of Governments (LSCOG) is requesting proposals to provide labor, materials and supplies for interior painting, carpet, and vinyl flooring of an approximately 14,000 sq. ft., commercial office building located in Aiken, S. C. For building walk thru contact Nora Sanders, nsanders@lscog.org.
This project consist of the installation of a proposed culvert system from the 18th Avenue North ocean outfall up to and along North Ocean Boulevard, 18th Avenue North and 16th Avenue North to overflow Shorehaven Lake and Springland Lake
RE-BID. Replace existing power & water infrastructure, with utilities to be installed through horizontal directional drilling/boring.
In partnership with Richland County, McEntire Joint National Guard Base (JNGB) seeks prospective vendors to procure temporary modular housing for firefighters. This initiative ensures firefighters remain highly responsive while renovating permanent facilities. Prospective vendors must submit a comprehensive work plan/proposal for temporary modular housing that demonstrates an ability to design, build, install, and carry forward each required phase of the project toward completion.
Beaufort County wishes to purchase and install a 50 kw Cummins Generator at the Sheriff’s Office Headquarters at 1501 Bay Street, Beaufort, SC
Installation of 21,972 LF 12", 9056 LF 10", 3964 LF 8", 138 LF 6" water main, (31) fire hydrants, site work for elevated storage tank, site work and construction of a pumping station. Constructed in 2 divisions.
Project funded by a grant from the SC Rural Infrastructure Authority, all Bidders must comply with all applicable state and federal requirements identified in the Contract Documents. SAM.GOV registration will be used to verify debarment status as required.
Sealed bids for construction of C-Fund paving for the +- 1,900 LF Rupert Courtney Lane will be received until 3:00 pm on Thursday , July 18, 2024. Deadline for submitting questions is Wednesday, July 10, 2024 by 5:00 pm.
Piping changes, pump replacements and duct modifications to improve filter access on AHUs. Also control upgrades for chilled water system, AHU-8 and heating hot water pump.
University of South Carolina River District Development
The Elloree Water System will receive sealed bids at 2623 Cleveland Street, Elloree, SC 29047 for Div. A-1: Approx. 741-LF of 8” water main and all other appurtenances. Div. A-2: Refurbishment of the Hampton Street well including new electrical, piping, and chemical building. Div. B: Refurbishment of the Food Lion 500,000-gal elevated tank. Contact Chris Waddell at CWaddell@aec-sc.com (803) 791-1400.
The overall project consists of the installation of approximately 11,728 LF of 12-inch waterline, 11 fire hydrant assemblies, and 42 water service re-connections. Also included are miscellaneous connections to the existing water system, 2 air release valves, and all other associated appurtenances required for a complete and proper installation.
Union County is now accepting bids for resurfacing of roads and streets of varying widths throughout Union County. Bid documents and Invitation to Bid Documents can be downloaded from official Union County Procurement webpage. www.gearupunionsc.com
Interior upfit to create (2) new lab spaces withing existing CNC Lab space with modifications to existing structural, mechanical, electrical, plumbing, & fire protection systems. One lab space is for Metrology with new dedicated HVAC system, finished ceiling, lighting, access and finishes. Second lab space is for Grinding Lab with new dedicated HVAC system, finished ceiling, lighting, access, and finishes.
This Project provides a new forty-five (45) space parking lot on the Beaufort County Government Center Campus between the new Arthur Horne Office Building and the existing Law Enforcement Center.
The Elloree Water System will receive sealed bids at 2719 Cleveland Street, Elloree, SC 29047 for Div. A-1: Approx. 741-LF of 8” water main and all other appurtenances. Div. A-2: Refurbishment of the Hampton Street well including new electrical, piping, and chemical building. Div. B: Refurbishment of the Food Lion 500,000-gal elevated tank. Contact Chris Waddell at CWaddell@aec-sc.com (803) 791-1400.
The work associated with this project includes Mechanical upgrades to the existing facility for the Recycling Area including Fans, Heaters, and Packaged Terminal Air Conditioners as outlined in the Construction Documents. Bidders shall submit bid in accordance with Hand Delivery or Mail Service only. Small and Minority Business Participation is highly encouraged.
Competitive sealed bids will be accepted for selected roof repairs at the BLEC in West Columbia on July 17, 2024 at 2:00 PM. A pre-bid conference will be held at the BLEC on July 8 at 2:00 PM. This project is being funded through a grant from the National Park Service Historic Preservation Fund. All Federal funding requirements will apply.
Restore watertightness & reduce air infiltration & exfiltration. Remove existing exterior joint sealants and backer rod & install new backer rods and sealant. Bids shall be submitted in accordance with hand-delivery or mail service only. Small and Minority business participation is highly encouraged.
CDBG funded Streetscape project involving demolition and replacement of sidewalks/roadway with brick and concrete pavers. Existing brick pavers to be left in place. Planter construction to occur around existing trees to remain in place. Coordination with City, utilities, and businesses is extremely important.
It is the intent of this solicitation to obtain qualified contractors to present specifications that, as a whole, make for a complete septic installation to provide a code compliant septic system and be readily available to install a complete septic system for property addresses located throughout Charleston County as they become available.
Remove 48'x11' concrete boat ramp. Construct new 95'x14' reinforced concrete boat ramp.
24245 LF of 8” PVC FM, 6415 LF of 8” HDPE or FPVC directional bore, 60 LF of 8” in 20” encasement bore, 14 ARV, 2 MH w/coating, 6” meter and vault. Alt Bids: 5480 LF of 6” in lieu of 8” PVC, 960 LF of 12” GS and 2 MHs in lieu of 8” FM, Rehabilitation of 11 MH. Project is funded by SRF and USDA RD.
The I-Block and J-block units involves demolition, resurfacing of existing showers, installing new stainless-steel showers, shower accessories, modesty panels as well as installation of epoxy floors and base in handicapped cells to complete specified work in accordance with the Contract Documents prepared therefore and entitled Moss Justice Detention Center Shower Replacement.
Replace fire alarm system, renovate restrooms, front lobby desk area, replace light fixtures to LED, mechanical duct work, new plumbing fixtures, four (4) storefront windows, new access control systems, new wall finishes, floor finishes, casework/countertops, lay-in acoustical ceiling, etc.
Installation Of 33 water services in the Henrytown Community. Work includes providing all labor and materials to connect residences to existing water meters, install service line from meter to resident service line from wells, capping existing service line at well, site restoration and appurtenances.
The City of Newberry wishes to solicit Design Build Services to renovate the old Newberry Observer Building at 1716 Main Street. The existing building is roughly 15,685 sf and will require a new TPO roof, exterior painting and storefront, new HVAC system, new electrical system, revisions to existing sprinkler system, interior upfit including concrete polishing, paving, and landscaping. Asbestos abatement and overall interior demolition have been completed.
New chiller plant intended to serve campus cooling needs. The full building supports 9,000 tons of chilled water
generation equipment. This phase completes the side development, building and provides the first 1,500 tons of chilled
water generation capacity. In addition, new 24" chilled water mains are being added to connect the plant to the existing
chilled water distribution system.
Replace existing rooftop units, VAV boxes, boiler, hot water pumps, exhaust fans, heaters and HVAC controls. Bids shall be submitted via hand-delivery or mail service only. Small and Minority Business participation is highly encouraged.
Berkeley County is seeking qualified contractors to upgrade and replace end of life cycle electrical and mechanical components for a Berkeley County Water and Sanitation (BCWS) Pump Station 090. Conduct satisfactory start-up and drawdown test on provided equipment. Demo identified equipment and restore pump station site after construction.
Berkeley County is seeking qualified contractors to upgrade and replace end of life cycle electrical and mechanical components for a Berkeley County Water and Sanitation (BCWS) Pump Station 096. Conduct satisfactory start-up and drawdown test on provided equipment. Demo identified equipment and restore pump station site after construction.
Berkeley County is seeking qualified contractors for new construction of a 900 square foot, one-story building to be used commercially for a soup kitchen. This project is being funded by CDBG.
Competitive, sealed bids will be accepted for gym renovations at the BLEC in West Columbia on July 16, 2024 at 2:00 PM. A pre-bid conference will be held at the BLEC on June 25 at 2:00 PM. The last date for questions will be July 9 at 2:00 PM. This project is being funded in part through grants from the Lexington County CDBG program and the National Park Service Historic Preservation Fund. All Federal funding requirements will apply.
Resurfacing of Knightsbridge Road; approximately 257 tons of asphalt
Installation of approximately 9,538 linear feet of 16" diameter PVC C-900 DR-25 water main, and all related appurtenances.
The Town of Summerville bids for new sidewalk construction on Central Avenue, including pedestrian signalization and crosswalk upgrades. Opportunities and RFPs | BidNet Direct - www.bidnetdirect.com/south-carolina/townofsummerville
Scope of work includes replacement of the low slope roof systems on ten (10) buildings down to the existing roof decks for a total of approximately 796 squares. Roof replacement includes minor roof deck repairs, roof insulation, and a twoply
modified bitumen roof system. Associated sheet metal components and accessories are included.
The scope of work for this project will consist of providing all required materials, equipment and labor necessary to install 1,885 linear feet of 6-inch water main, one new fire hydrant, twenty three gate valves and all other necessary appurtenances. Details are included within the Construction Plans and Technical Specifications. This project is being funded in part by the Community Development Block Grant Program (CDBG). All federal CDBG requirements apply.
This project involves installing two (2)-65-LF of 48-inch Reinforced Concrete Pipe (RCP) encased within 66-inch steel casing pipe. Specific work items involved in the execution of the project include, but are not limited to, jack and boring and installing stormwater pipes underneath an active CSX railroad
The Clover School District is accepting bids for construction of Liberty Hill Elementary School.
City of Charleston is soliciting bids for demo of existing interior walls and finishes, construction of new wall and finishes for offices, jury waiting room, restroom and kitchen. Exterior work includes addition of a new window in the existing exterior wall and replacement of an exterior door. Mandatory pre-bid meeting will be held on Thursday, June 20 at 11:00am on site. Sealed bids will be received until July 11 at 2:00pm and publicly opened at 823 Meeting St.
Construction of this project will require the installation of 11,196 feet of 8" and 10" gravity sewer, 2,029 feet of 4" force main, 67 manholes, and 126 single and double service connections, and construction of a duplex submersible pump station with applicable support infrastructure. Gravity sewers, service lines, and the force main will be constructed beneath and along the edge of the existing public roadway pavements throughout the subdivision.
The work includes selective demolition and renovations as indicated on the contract documents to a portion of the existing building to allow for the installation of a new female latrine. Renovations and alterations to the Armory include, but are not limited to the installation of a new concrete slab, partitions walls, doors, interior finishes, vanity, toilets, showers, mechanical, electrical, and plumbing to include replacement of SS Lines.
Replace existing Motor Control Centers in the Mechanical Penthouse and other work indicated in the contract documents. This is a Re-advertisement to extend the Bid-opening date. The bid-opening location will remain the same.
Replacement and relocation of Split System Heat Pump w/Gas Furnace, Cooling Coil, Replacement of Ceiling and lights, as detailed on drawings and specifications
The City of Lake City is soliciting bids for the HUD-CDBG funded project to relocate the Graham Road Pump Station.
Work includes sidewalk improvements within City Council District 8 in the City of North Charleston. 535 LF of new sidewalk and 38 LF of new strom drainage on Maxwell Street. 1950 LF of new sidewalk and 472 LF of storm drainage on Braddock Avenue. 1900 LF of new sidewalk and 47 LF of storm drainage on North Boulevard. 1625 LF of new sidewalk on Durant Avenue. Add-Alternate (1600 LF of new sidewalk on South Boulevard)
The project is to renovate Kirkland CI's medical to support the new CT scan machine. The scope of work will include installation of a new transformer, new lighting, required air conditioning unit for cooling and dehumification of equipment. Wall inculding doors and windows for CT machine have to be lined with lead. CT machine already paid for by owner.
The project to renovate/replace the concessions & restroom buildings at the Blackville-Hilda HS Stadium as per bid documents.
TN Development is requesting bids from general contractors for a rehabilitation project located at 5216 Randall Ave. This City-owned property will be undergoing rehabilitation using (HUD) funds. All work shall be subject to the City of Columbia’s Single-family Housing Improvements For Neighborhoods Enhancement Program.
Jasper County, SC d/b/a Skyblue Aviation is seeking proposals from qualitied person or entities to provide hangars and associated structures to conduct select aeronautical services or personal storage hangars for the redevelopment of the Ridgeland-Claude Dean Airport, Terminal South. The airport will enter into appropriate ground lease(s) and operating agreements(s) with the successful proposer(s).
This expansion will increase plant treatment from 4-MGD to 6-MGD by adding new sedimentation basins, two new filters, chemical injection systems, a one million gallon clear well and associated appurtenances. Please see documents for complete details.
Construction of: Replacement pump station (Watergate Lower), 900’ of 6” sewer force main, triplex submersible pump station (Old Chapin Regional), and decommission the Watergate WWTP. Refer to Town website for detailed project description. Contact Chris Waddell at CWaddell@aec-sc.com (803) 791-1400.
CMEOC, Inc Seeking contractors for Weatherization and LIHEAP Programs to perform weatherization services/install appliances in Chesterfield, Marlboro, Darlington and Dillon Counties. Applicant must possess:
Interested parties please contact Kim Quick at 843-320-9760
The Oconee Joint Regional Sewer Authority is requesting bids from contractors interested in the repair and replacement of select portions of the OJRSA gravity system in Oconee County, South Carolina. (Readvertisement of SCBO Ad# 41170 due to no bids received)
The work includes, removal and proper disposal of an existing floating kayak dock, modifying the layout and performing repairs to an existing timber deck, performing repairs to an existing timber bulkhead, driving five new composite piles, and installation of two new floating docks.