This project consists of landscaping, irrigation, fencing, dugout renovations, and a number of other items which are in the bid documents. A site visit is mandatory. Please contact the project coordinator to schedule a visit.
Richland County is requesting electronic bids from qualified contractors to rehabilitate Fashion Drive/Market Place Commons - Approximately 1.19 miles of roadway to be milled/resurfaced at 2”; Forum Drive - Approximately 1.04 miles of roadway to be milled/resurfaced at 2”; Saint Andrews Road – Approx. 0.37 miles of roadway to be rehabilitated using CMRB method B at a mixing depth of 8” with a 2” asphalt overlay; Meadowland Court – Approx. 0.05 miles....
The City of North Augusta wishes to demolish and replace two dugouts on youth baseball field #3 at Riverview Park.
Roof Restoration of the JW Copeland Building at 100 & 102 W Main St in Clinton, SC 29325, We are seeking qualified contractors to remove and replace the existing roof. This is in correlation with funding from the SC Department of Archives and Historic preservation. Bid specification are available at the MS Bailey Municipal Center located at 211 N Broad St. Please contact Vernon Edwards, at 864-833-7500 or jedwards@cityofclintonsc.com.
Provide and install location, direction, and privacy signage at Hardeeville Police Department.
Berkeley County is seeking capable and qualified contractors to provide and install three (3) Judge Benches and three (3) Jury Boxes for the Goose Creek Magistrate located in Goose Creek, SC.
Spartanburg School District Six is requesting Contractor Qualification Statements for the RD Anderson Applied Technology Center D & E Wings Roof Replacement Construction Project that includes removing the existing low-sloped built-up roofing, preparations to the existing substrate materials and the new installation of a 2-ply Modified Asphalt BUR roofing assembly.
Sealed bids for preparatory work and resurfacing a parking lot located around the Village Green in Pendleton, SC, will be received at the Town Office until 2:00 pm, October 16, 2024. The bids will be opened and reviewed at 2 PM on 10-16-2024.The bid will be awarded to the lowest qualified bidder at a regularly scheduled Town Council meeting on November 5, 2024
CLARIFICATIONS FOR THE PROJECT.
The project consists of the demolition and installation of new chain link and wood fencing, along North 12th Street, Leaphart St and Hall Street in West Columbia SC. Prior experience, qualifications and product certification will be required.
Approximately 33,542SF one story Readiness Center in Aiken SC, for the SC National Guard. The project will be registered with the USGBC & will be designed for LEED Silver, with both Fundamental & Enhanced Commissioning. Supporting facilities include: combined 8,300 SF GP Training Bay & Storage Bldg; 330 SF Controlled Waste Bldg; 110 SF Flam Mats Bldg,
~4200 SF of metal roof replacement and ~370 SF or metal wall replacement
Remove and replace existing asphalt surrounding the physical plant and storage buildings.
BID POSTPONEMENT NOTIFICATION: The removal of the two existing elevator systems, the replacement of critical components, the modernization / upgrade of the existing controls, cabs, and the supporting mechanical and electrical infrastructure to ensure operation and code compliance. Contractor to ensure permitting for installation and post installation inspections through the SC LLR requirements.
Sealed bids are being solicited for Horse Creek WWTP Plant Modifications and Improvements. Project includes the following work: Installation of new belt filter press, conveyors, sludge pump, wash water pump, polymer feed system, filtrate pump station, solids handling tank, jet aeration system, blowers, rotary drum screens and associated piping & electrical work. Equipment associated with project has been procured. Project is grant funded and local preference does not apply.
The scope of work includes general renovations Kirkland CI for the addition of 31 bed inmate housing. Scope of work includes new plumbing additional bathroom facilities, reworking of fire suppression system, new electrical and mechanical systems in areas affect by new work. Interior finishes, new walls, windows and doors. Roof work as well as infilling at existing loading dock.
Non-Mandatory Pre-Proposal meeting 9/12/24 @ 2:00 p.m. (ET) held virtually via zoom
https://us02web.zoom.us/j/88971645357?pwd=bFkTAUuxfAfApMy1RwMbvROWDlqQov.1
Meeting ID: 889 7164 5357
Passcode: 362297
Pursuant to South Carolina Consolidated Procurement Code Section 11-35-1520 of the Code of Laws of South Carolina, sealed bids for “Localizer Replacement” at the Rock Hill/York County Airport will be received by the City of Rock Hill until 2:00 P.M. (local time) on Wednesday, September 25, 2024. Immediately thereafter, the bids will be publicly opened and read aloud in the Conference Room of the Rock Hill/York County Airport located at 550 Airport Road, Rock Hill, South Carolina 29732.
Renovation and reconfiguration of approximately 4,314 SF of office space on the 4th floor of the Clinical Sciences Building. Scope includes new doors, frames and hardware, new walls, finishes, ceilings, ceiling grid, and related mechanical, plumbing, and electrical modifications.
CCAA is requesting SOQs from qualified firms to provide comprehensive Construction Manager at Risk services during design and construction phases of Temporary West Gates at CHS. Eligible prime contractors must be registered as both construction manager and general contractor in South Carolina. Mandatory presubmittal Thurs. Sept. 12, 2024 10:00am.
Approximately 32,017 LF of 60” Welded Steel Pipe (WSP) Transmission Main, 50 LF of 36” DIP, 654 LF of 72” Steel Casing installed by jack and bore, 407 LF of 6” DIP and all associated appurtenances.
The work to be done consists of furnishing all materials, equipment and labor necessary to
construct the Diamond Branch Water and Sewer Improvements, consisting of the following;
Division 1: Pump Replacement
Division 2: Water Line Replacement
Division 3: Force Main Replacement
Furnish all labor, materials, equipment, and incidentals required to construct and install the new 36-inch gravity trunk sewer, associated appurtenances, erosion/sedimentation control, and equipment for the installation of the new sewer main in its entirety as shown on the Drawings and as specified herein.
Demolish existing building and construct a new building per specifications. Also included is an alternate bid to include work on an existing gazebo.
A Mandatory pre-bid is scheduled for September 17, 2024 at 10:00 am. See bid documents for location and details.
(REVISED) Replace existing main service switchboard, panelboards, dry-type transformers and electrical feeders. Patch and repair walls to accommodate new flush mounted panelboards.
Replacement of Air Handler #6 in the Hollings Cancer Center. The existing air handler is approximately 20 years old and nearing the end of its service life. The air handler has significant deterioration. Air Handler #6 is critical to Hollings Cancer Center research operations and needs to be replaced. This invitation also includes a bid alternate that adds an additional clean steam generator for support of AHU-6.
30' x 30' Metal Storage Building and 2 each batting Cages
Installation of the Owner provided motor control centers and circuit breakers; demolition of the existing electrical systems, providing & installing wiring, conduit, panels; removal replacement of the existing lighting fixtures; & associated work tasks.
Project consists of removing (1) existing double exterior entry door & install new double exterior entry door. Door hardware consistent with COH approved door system tying into CPI system. Test new installation for full functionality. Removing (6) existing windows & replace with (4) new windows. Internal walls patched and painted to match existing. Newly constructed exterior wall shall be stuccoed. Paint shall match existing color pigment.
The project is being funded through the SC Infrastructure Investment Program (SCIIP) through the SC Rural Infrastructure Authority (RIA). The City seeks to optimize the existing influent pump station, clarifiers, oxidation ditches, and other unit processes to restore the WWTP back to its intended performance level.
The Project includes the following Work:
Rehabilitation of existing pump station with replacement of two (2) submersible pumps, valving, piping and electrical panels.
Agency facility needs the entire roof replace with Shingles.
The work consists of furnishing all materials, equipment and labor necessary to
construct the Sanitary Sewer Rehabilitation for Martha Law Estates:
Includes 598 LF of removal and replacement of 8” gravity sewer, 179 LF of removal and
replacement of 10” gravity sewer, 3,066 LF of pipe bursting 8” gravity sewer, 10 point
repairs, 14 manhole rehabilitations, 4 new manholes, 57 services and associated
pavement replacement and resurfacing.
The City of Greenville is requesting bids from qualified contractors for the Pedestrian Safety Action Plan - Phase 2. This project scope includes curb & gutter repair; concrete sidewalk repair; concrete medians & ramps; installing detectable warning surfaces & thermoplastic pavement markings (cross walks etc.); installation of rectangular rapid flashing beacon’s (RRFB’s), traffic control and any erosion control, as necessary.
The project is for the installation of Cured-In-Place Pipe (CIPP) lining of approximately 1,200 feet of existing 30-inch sewer and 1375 feet of 36-inch gravity sewer, located in two cross-country sections behind Moss Creek Drive Neighborhood and Old Dunbar Road Neighborhood, and the manhole rehabilitation of 18 manholes of various sizes and depths.
Asphalt resurfacing of Patriot Boulevard starting at the intersection of Ashley Phosphate Road (S-62) and ending approximately at the intersection of Dorchester Road (SC-642).
The work shall include traffic control, milling, surface preparation, asphalt resurfacing, striping and associated appurtenances within the project limits for these roadways.
Seeking to hire a company to execute a design/build project to add a secure entry area to the existing Student Union building. "The main function of the addition is to provide an added layer of security for students and staff entering the facility while also creating it as a main focus area of the entire campus.
Pre-Bid Meeting will be held on September 11, 2024 at 10 AM via Zoom. Zoom link is provided in the solicitation.
Furnish all materials, labor and equipment necessary for the removal of approx. 232 LF of 12" sewer pipe, and replacement of approx. 232 LF of 15" SDR 26 PVC gasketed sewer pipe, of varying depths, for the completion of the work as set forth in the Proposal, as shown on the contract drawings, and any property restoration and erosion control per City of Aiken Specifications.
The project generally consists of approximately 21,850 LF of 16-inch water main, 30 LF of 10-inch
water main and 4,440 LF of 8-inch water main, a control valve station, associated SCADA, and
all appurtenances and incidental construction in accordance with the plans and specifications.
The project is a SCIIP Grant project (# A-23-E124) that generally consists of an elevated water storage tank, several existing water main interconnects, and all appurtenances and incidental construction in accordance with the plans and specifications. Bid alternates are included in the Bid Form for differing types and sizes of tanks including composite tanks, multi-leg tanks and pedosphere tanks. Sizes include 500,000-gallons, 750,000-gallons and 1 million gallons.
The Town of Hilton Head Island is soliciting proposals from qualified and properly licensed contractors to construct Phase 2 of planned improvements for the Islander’s Beach Park.
Replace existing equipment for sliders with new detention electro-mech. sliding devices, & Security Electronics controls in several buildings.
Replace existing equipment for sliders with new detention electro-mech. sliding devices, & Security Electronics controls in several buildings.
Replace existing equipment for sliders with new detention electro-mech. sliding devices, & Security Electronics controls in several buildings.
Replacement of HVAC units and supporting services (architectural, structural, mechanical, and electrical work).
Scope of work includes replacement of the low slope roof systems down to the existing roof decks for a total of approximately 390 squares. Roof replacement includes minor roof deck repairs, roof insulation, and a PVC/KEE roof membrane system. Associated sheet metal components and accessories are included as well as new lightning protection.
The Town of Lexington, South Carolina is requesting proposals to replace portions of the roof at 209 S Lake Dr. (Clark House). The project is to include any and all materials and labor to provide replacement of approximately 605 square feet of metal roof. Official documents and detail can be found at www.lexsc.gov
Construction of 297 space asphalt parking lot with access road and associated grading, drainage and electrical work
Placement of security doors in church building, sanctuary, east and west door(s) replace doors to the kitchen area, the pastors office exit into the sanctuary. Doors must be impact resistant steel doors placed into existing door spaces, with the aesthetic and materials suitable for a church building. Timeframe to be determined by the church. Track record of project completion required.
Installation of approx. 7,400 linear feet of 10" & 8" DI water mains and related appurtenances along Old River Road in Anderson County.
Provide labor and materials for campus reflection pond improvements, including hardscaping, landscaping, lighting, pond filtration upgrades, grading, drainage, CIP concrete and dry stack boulder retaining walls, sanitary sewer upgrade, concrete stair work, and sediment and erosion control measures. Bidders shall submit bids in accordance with Hand-Delivery or Mail Service only. Small and Minority business participation is highly encouraged.
Renovation of the existing parking lot east of the Anderson Library to include
some reconfiguration of the parking layout and resurfacing. No new buildings will be added. Bidders shall submit bids in accordance with Hand-Delivery or Mail Service only. Small and Minority Business participation is highly encouraged.
The scope of work includes new partition walls, new mechanical system, new electrical system, a wood dance floor, modified fire protections system, new aluminum windows, new hollow metal frames and SWC doors and new finishes throughout.
Cherokee County School District intends to select a SC General Contractor/Construction Manager to provide their knowlodge, services, and project management to the District in pre-construction and construction phases for the construction of new baseball and softball fields and accompanying athletic buildings in Gaffney. As well as, renovations to our existing baseball and softball fields and accompanying athletic buildings in Blacksburg.
Florence County, South Carolina (Owner) is accepting bids from licensed and qualified Contractors to construct an expansion to the concession stand located at 3307 US Hwy 52 Coward, SC 29530.
Base Bid: Replacement of approximately 1,143 water meters varying in size from 3/4" to 2" and new advanced meter infrastructure system including data collectors, endpoints, encoders and all other associated components for a complete turnkey project.
Bid Alternate (Addition): Additional cost to provide spare water meters.
Expansion to the existing water system to include the following work: Construction of approximately 1,780 LF of 2" waterlines, 31,697 LF of 8" waterlines and all related work and appurtenances
Provide redundant cooling system for computer room, including general construction, mechanical, and electrical work.
4360 LF of 8” gravity sewer and related appurtenances
Rock Material and Hauling needed
The City of Greenville is requesting sealed bids from qualified contractors for its E. Parkins Mill Road Raised Intersections project. The scope includes construction of two raised intersections including minor storm drainage, sidewalk, curb and gutter, minor grading, pavement demolition, concrete pavement, traffic control, minor asphalt paving, sediment and erosion control, and temporary access road construction.
Replace fan coil units, air handlers, pumps, steam station, piping, and controls of a housing dorm.
Rehabilitation of six dual media gravity filters. Work includes concrete rehabilitation, removal and replacement of dual media and underdrains, and minor electrical and control updates.
The project consists of approximately 9,800 LF of 12" waterline and associated site work and appurtenances, abandonment of existing waterlines, and demolition of Waterford Pointe hydro-pneumatic station.
Construction of a 1,000,000 gallon elevated storage tank, approximately 840 LF of 12" waterline and associated site work and appurtenances.
Modify the electrical service entrance and emergency power system for the BRC structure as detailed in the drawings and specifications. Owner provided hardware is noted in these documents. Contractor to provide all other hardware and labor. The scope of work combined with the desire to avoid power outages will require a complete temporary power delivery system as noted in drawings. Special notice must be given to the removal of the existing Zenith Controls in the switchgear.
The scope of work includes interior and exterior upgrades to the Goldsmith and IT buildings to improve security. Improvements include; replacement of existing widows with vandal proof glazing, new doors and hardware, security ceilings, additional exterior lighting, building alarm system, and new storage building.
Separate sealed bids for the Cole Road Pump Station for the City of Lake City will be received
by the City of Lake City in the Lake City Administrative Offices at 202 Kelley Street, Lake City
SC 29560 until 2:00 P.M. on September 24, 2024. The work to be done consists of furnishing all materials, equipment and labor necessary to
construct the Cole Road Pump Station,
The County of Darlington is requesting sealed bids for the resurfacing of Blazing Trail Road. The scope of work consists of placing approximately 200lbs. per Sy., of Type 2 hot-laid asphalt over existing pavement.
The County of Darlington is requesting sealed bids for the resurfacing of Oakdale Green St., and Primus Park Rd. The scope of work consists of placing approximately 200 lbs., per Sy., Type 2 hot-laid asphalt over the existing pavement.
Including, but not limited to, construction of a new canopy structure serving outdoor welding/grinding operations,
provision of new and reconfigured welding and grinding booths, and associated sitework, plumbing, mechanical, and
electrical scope.
Installation of approximately 825 LF of 6-inch water main installed along Newberry Street between Barnwell Avenue and Richland Avenue and 255 LF of 2-inch water service from the new main to existing service connections.
Furnish labor, materials, equipment, services and accessories, and install materials, equipment and accessories, necessary to provide a complete and functioning system as shown on the Drawings and specified in the Construction Specifications.
Installation of approximately 1,250 LF of 2-inch PVC piping, valves, fittings, services, and other miscellaneous and related items to serve areas along US 601 near New Bethany Road.
The City of Greenville is requesting bids from qualified contractors for the new Southernside Multi-Service Center Project. The project includes, but not limited to, demolition of existing structure, parking lot, and associated appurtenances; construction of a new multi-service center; erosion and sediment control; paving and striping a new parking area; construction of pedestrian ramp; concrete sidewalks; curb and gutter; and landscaping.
Renovation of the existing parking lot east of the Anderson Library to include some reconfiguration of the parking layout and resurfacing. No new buildings will be added. Bidders shall submit bids in accordance with Hand-Delivery or Mail Service only. Small and Minority Business participation is highly encouraged.
Division 1 – Installation of approximately 31,000 linear feet of new 3-inch water mains and related appurtenances. Division 2 – Upgrades to Liberty PS to include new pump, piping, electrical and standby generator and Rainbow Lake PS to include electrical and new standby generator. Division 3 – Construction of new 500,000 gallon elevated storage tank, site work, piping and related appurtenances.
The Housing Development Corporation of Rock Hill (HDCRH) is seeking competitive bids from qualified firms to provide the HDCRH with turn-key construction services for the building of two single-family homes at 115 Allen St & 225 Baker St., Rock Hill SC 29732.
The County of Orangeburg is requesting quotes for Rocks for Road Projects. The bid document and other related information can be found at https://sc-orangeburgcounty.civicplus.com/Bids.aspx or www.bidnetdirect.com/south-carolina/orangeburgcounty . Late bids will not be accepted. Orangeburg County reserves the right to accept/reject any or all bids.
Installation of two (2) hypochlorite generators (1,000 pounds per day), rectifiers, dosing pumps, transfer pumps, blowers, stand pipes, chillers, two (2) hypochlorite tanks, one (1) brine tank, miscellaneous valving and piping; and electrical work and controls. It also includes the demolition of existing equipment as shown in plans.
The Town of Hilton Head Island is soliciting sealed proposals from qualified and properly licensed contractors to construct beach wheelchair storage structures at various locations on Hilton Head Island. The due date for submission of bids is 5:00 P.M. Eastern Time, September 10, 2024. A copy of IFB 2024-32 may be downloaded from https://hiltonheadislandsc.bonfirehub.com
Proposals are being accepted for the replacement of the roof on the Saluda County Health Service Building located at 613 Newberry Hwy. Saluda, South Carolina 29138. Please contact John Oscar Perry to view the site and ask any questions 864-321-4388.
Proposed development consists of stabilization of eroded slopes through the installation of an Envirolok retaining wall system. Project included the construction of a pervious path to improve pedestrian safety, reinforcement of concrete structure to improve stability & a variety of native plantings to enhance the user experience.
The project consists of (3) dormitories. Replace rooftop heating only units for Dorm 1 and 2 with new 25-ton rooftop heat pump. Replace (2) L.P. gas furnaces in each of (3) wings of Dorm 4 with new L.P. gas furnaces, DX coils, 5-ton condensing units, and associated ductwork, diffusers, controls and electrical power for HVAC.
There are three housing units for this project. Replace (2) nat. gas furnaces with a 15-ton split system heat pump, and associated ductwork, diffusers, controls and electrical power for HVAC per housing unit.
Aiken County South Carolina is Soliciting Seald Bids for Huber Clay Convenience Center. Required Documents and all information needed is posted on Aiken County Website under "Bid Opportunities". Recently posted Addendum #1 detailing pre-Bid Meeting which will be held on August 28th @ 10:00 a.m. At Aiken County Government Center Sandlapper Room.
Five bioretention cells and replacement of stormwater infrastructure.
Construction of two booster pump stations on separate sites and associated appurtenances
including site work, piping, access drive, and connection to the existing system.
The City of Greenville is requesting sealed bids from qualified contractors for its Lowndes Hill Road and Hillside Drive Intersection Improvement Project. The project location is at the intersection of Lowndes Hill Road and Hillside Drive.
Library parking lot asphalt will be cut, replaced, and restriped. Minor improvements to driveway entrance and HC parking. Athletic Cen. will have existing parking restriped and concrete removed and repoured in select areas/ entrances. A small amount of asphalt will be placed at the maintenance connection to the lot. Bidders shall submit bids in accordance of Hand-Delivery or Mail Service only. Small and Minority Business participation highly encouraged.
CWS is requesting interested contractors to complete an application for prequalification of bidders to provide all labor, equipment, and materials necessary for noted project. Project consists of multiple water main vertical offsets, horizontal relocations, sewer main replacements including new manholes, water and sewer line adjustments, and all associated appurtenances. The project will be bid in Q4 2024.
CWS is requesting interested contractors to complete an application for prequalification of contractors to provide all labor, equipment, and materials necessary for the construction of the noted project. The project consists of replacing approx. 67' of 24" c/iron pipe with new zinc coated d/iron pipe, 35' of 8" C900 pipe, 20' of 30" steel casing by open-cut, 8" tie-in, 2 manholes, temporary bypass, and all other associated appurtenances. The project will be bid in Q4 2024.
Aiken County is soliciting bids for roadway improvements for Joe Scott Rd. Approximately 1.005 existing dirt road located NE of Perry, SC. Plans, Specifications, and Contract Documents may be obtained from Cox and Dinkins Inc., Mac Atkins, 724 Beltline Blvd. Columbia, SC 29205, 803-254-0518 and pickup M-F 9am-4pm. There will be a non-refundable $75.00 per set deposit required.
Labor and Materials to Remove and Replace Six (6) HVAC Units Located in Manning, SC 29102.
This project is funded by an Energy Efficiency and Conservation Block Grant. Davis-Bacon Act and Build America, Buy America are applicable.
Marlboro County Government is issuing this RFP soliciting proposals from qualified firms to complete the removal old windows and installation of new vinyl clad double hung window units with six over six, slope sill, low-E Argon made to fit existing openings. The windows replace old wooden frames and sashes in the three-story Administration building.
Looking to Update to keyless entry doors on our school buildings. 8-9 entry ways. Will need some framing. A non-approved vendor has given an estimate that can be emailed with sizing and blueprints if needed..
Replace facility HVAC system per project manual dated July 17, 2024 AND bid documents as required.
Contract 1 consists of constructing a new 300,000-gallon elevated storage tank, piping, valves and all associated appurtenances along with miscellaneous site improvements.
Contract 2 consists of the installation of approximately 160 linear feet of 12” HDPE water line, 3,200 linear feet of 10” water line, 300 linear feet of 6” water line and all associated appurtenances along with
a new control valve site.
Installation of approximately 9,810 LF of 8” DI and 5,760 LF of 6” DI waterlines with misc. appurtenances including (28) fire hydrants in Due West, SC. Included above is 1,780 LF of directional drill and 240 LF of jack and bore. The work is divided into a Base Bid with three (3) add alternates.
The District is soliciting proposals from firms to perform Integrated Project Delivery services to perform construction services, including pre-constructive services at all of these facilities. Such work shall include primarily point of entry locations. These may be in the form of interior modifications and upgrades, minor additions, structural modifications, creation of temporary entry/egress points, door hardware, window film and fencing.
The project will consist of the installation of approximately 15,230 linear feet (LF) of 12-inch ductile iron pipe (DIP) water line, 3,930 LF of 8-inch DIP Water line, 138 LF of 24-inch steel casing by jack and bore, 19 fire hydrants, a pressure reducing valve vault, and necessary appurtenances and connections.
Full description available on www.batesburg-leesville.org/rfpsbid-opportunities
NOTICE IS HEREBY GIVEN – The City of Spartanburg is requesting proposals to demolish residential structure(s) in the City of Spartanburg, at 213 Windgo Street - Spartanburg, SC. pre-bid tour is scheduled for Tuesday, September 3, 2024, at 9:00 AM starting at the site: 213 Windigo Road - Spartanburg, SC 29306.
The replacement and rehabilitation of approximately 2500 LF of 8" sewer through various means including direct replacement, pipe bursting, pipe lining and boring. The project also includes the replacement or rehabilitation of 14 sanitary sewer manholes. A pre-bid meeting will be held Tuesday August 27th @ 2:00 PM.
This project generally consists of the installation of approximately 15,369 linear feet of 6-inch water lines, 6,897 linear feet of 2-inch HDPE directional drill water lines, 16 fire hydrant assemblies and other related tasks for a complete and proper installation.
Sealed Bids for the construction of the EDWARDS ROAD FORCEMAIN, will be received, by the CITY OF WOODRUFF, at the office of 231 E HAYNE STREET, WOODRUFF, SC 29388, until 1:00 PM local time on Wednesday, October 2nd , 2024, at which time the Bids received will be publicly opened and read. The Project consists of the installation of approximately 9,6000 LF of 12-inch forcemain, along with related fittings, system connections and other appurtenances.
The City of Easley is soliciting sealed and competitive REQUEST FOR PROPOSALS from qualified contractors for the Hagood Park - Roadway Renovation and Parking Lot Enhancement Project.
The project consists of the installation of approximately 20,000LF of Ductile Iron Pipe, 138 valves, and 18 fire hydrants on Union Street. Includes service re-connections and asphalt removal/replacement. This project is being funded in whole or in part by the South Carolina Infrastructure Investment Program (SCIIP), which is administered by the RIA and funded by SLFRF through the American Rescue Plant Act (ARPA). SCIIP Grant Award A-23-C182, Federal Award ID: SLFRP5410
Replace fire alarm system in the Anderson Library, Arts & Letters, Nettles and Schwartz Buildings. Bidders shall submit bids in accordance with Hand-Delivery or Mail Service only. Small and Minority Business participation is highly encouraged
Rehabilitation of existing RCP and VCP gravity trunk sewer within OJRSA easements and other public rights-of-way. Work consists of approx. 20,685 LF of Cured-In-Place Pipe (8”-6,000 LF; 12”-1,700 LF; 15”-12,000 LF; 18”-350 LF; 30”-235 LF), seven (7) point repairs varying from 8” to 30”, approx.. 700 VF of manhole rehabilitation and replace and removal of select frame and
covers, manhole cone replacement, and flow control/bypass pumping. See www.ojrsa.org/opportunities.
Electrical work to prepare for electric bus charging stations located in Georgetown County School District - 2 site locations.
Non-Mandatory Site Visit 8/22/24 @ 9:00 a.m. in person, Non-Mandatory Pre-Bid meeting 8/22/24 @ 11:00 a.m. held in person and virtually, Non-Mandatory OBO Outreach meeting 8/22/24 @ 2:00 p.m. held in person and virtually. All times ET - see solicitation for locations and zoom links.
Contractor to furnish all labor, equipment and materials to resurface Forest Hill Subdivision for a total of 1.45 miles.
Division 1 includes 20,760 LF of 12” forcemain and 2,714 LF of 8” gravity sewer line. Division 2 includes demolition/closeout of the existing Jonesville WWTP, influent structure, holding basin, effluent structure, upgraded duplex sewage lift station, and new duplex submersible sewage lift station. Division 3 includes 4,560 LF of 10” forcemain, 12,345 LF of 8” forcemain, and improvements to two (2) existing sewage pump stations.
Bamberg County is requesting invitation for bids for re-roofing of the Bamberg County Courthouse. Drawings and bid documents may be obtain from PMH Croft, Architect & Engineers. A mandatory pre-bid conference is scheduled for Thursday, August 29, 2024 at 10:30am at the Council Chambers located at 1234 North Street, Bamberg, SC 29003
Replace heating and ventilating air handling unit with air handling units and local chiller. New ductwork from units to cells and new piping from chiller to units and campus heating water tap to units. Replacement of roof mounted fans. New building transformer and medium voltage distribution to transformer location. Structural modifications for new attic units. Relocation of fire protection main piping around the attic.
This project consists of providing all required materials, equipment and labor necessary to complete the construction of Roadway Extension Improvements to Serve the Southern Carolina Industrial Campus in Hampton County, South Carolina. Generally, the project includes the new construction of +/- 4,800 linear feet (LF) of roadway improvements, proposed traffic circle and associated storm drainage. Contract documents available at Alliance Consulting Engineers, Inc.
Clarendon County is accepting sealed proposals from qualified firms. The desired end result shall be a 9,240 sq ft turn-key Public Works facility with 8,220 sq ft. attached shed and a 9,300 sq ft. turn-key Animal Control Facility with related roadway and site work.
Pls send email if you would like the RFP Manual sent to you.
bclark@acpsd.net
This project consist of the installation of various sizes of RCP and perc pipe in the roadway r/w's. It also consist of the installation of catch basins, the completion of asphalt patches at roadway crossings, and the completion of driveway and landscape work where applicable. Erosion and Sediment control will also need to be implemented throughout the project as shown on the plans. Please refer to the civil plans for the work to be completed in.
The removal of the two existing elevator systems, the replacement with two new systems, the modernization/ upgrade of the existing cabs, and the supporting mechanical and electrical infrastructure to ensure operation and code compliance. Contractor to ensure permitting for installation and post installation inspection through the SC LLR requirements.
RE-Bid: Revise existing electrical service connection from the existing CFSH overhead distribution system to Dominion Energy underground distribution.
The project consists of the demolition and installation of new chain link and wood fencing, along North 12th Street, Leaphart St and Hall Street in West Columbia SC. Prior experience, qualifications and product certification will be required.
Includes installation of 3,185-LF of 2-inch waterline replacement, +/-6,405-LF of 6-inch waterline replacement, and all other necessary appurtenances. Specific details are included within the Plans and Technical Specifications. This project is being funded in whole or in part by the CDBG and SCRIA. all federal CDBG requirements will apply to contract. All contractors and Subcontractors are required to be registered in the federal System for Award Management (SAM).
For information to Bid for Classroom Mobile Units
Pls email bclark@acpsd.net and jjones2@acpsd.net
Request for Quote (RFQ) for construction services to renovate 2,900 sf of an existing shared office building space into an open concept. Demolish existing interior space, new storefront entrance and exterior storefront windows, new restrooms, interior finishes, and roof repairs. Please Note that the Lady Street Suites entrance will remain open for business during renovation. Contractors must ensure minimal disruption to occupied areas.
Constructing a new 6” waterline along Old Metal Road from the intersection of Battleground Road to the intersection with Daniel Morgan School Road.
Building/construction of new law enforcement training center.
Construction of a public restroom (approximately 490 sq. ft.) at CADA Park in Chesnee, SC. The building is to be constructed of split-face concrete block with painted concrete floor and metal roof. The project includes clearing, grading, plumbing, electrical and other related work. City of Chesnee is the Owner. PDF copies of plans and specifications available at no cost from Summit Engineering Group, Inc.
The limits of this project extend approximately 1.4 miles in length starting at the intersection of Pendleton Street and Mason Street extending east down Pendleton Street to the intersection with Vardry/South Main Street. An alternate bid will continue north up South Main Street to the intersection with Augusta Street.
Renovation of the 8th floor to provide pediatric inpatient rehabilitation facility services. The project will create support and therapy areas including a gym, occupational living and therapy spaces.
The Contract Project consists of the supply and installation of water meters and meter registers of various sizes for measuring potable water usage and in the installation, implementation, and use of fixed base automatic water meter reading devices (AMR).
Richland County is soliciting electronic sealed bids from licensed contractors, for a new sidewalk along Percival Road from Forest Drive to Decker Boulevard.
Richland County is soliciting electronic sealed bids from licensed contractors, for a new sidewalk along Percival Road from Forest Drive to Decker Boulevard.
Installation of four (4) windows at the Beaufort County Sheriff's Office
Replacement of exterior egress stair and repair of the north elevation wall at Dorm C. Replacement of the exterior front stairs, porch decking, railings, and new building signage at the Marine Lab. Bidders shall submit bid in accordance with Hand-Delivery or Mail Service only. Small and Minority Business participation highly encouraged.
University of South Carolina River District Development
TN Development is requesting bids from general contractors for a rehabilitation project located at 5216 Randall Ave. This City-owned property will be undergoing rehabilitation using (HUD) funds. All work shall be subject to the City of Columbia’s Single-family Housing Improvements For Neighborhoods Enhancement Program.
This expansion will increase plant treatment from 4-MGD to 6-MGD by adding new sedimentation basins, two new filters, chemical injection systems, a one million gallon clear well and associated appurtenances. Please see documents for complete details.
Construction of: Replacement pump station (Watergate Lower), 900’ of 6” sewer force main, triplex submersible pump station (Old Chapin Regional), and decommission the Watergate WWTP. Refer to Town website for detailed project description. Contact Chris Waddell at CWaddell@aec-sc.com (803) 791-1400.